MEC02-00713
| Pressure Test | 3/22/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/22/2002 at 16:09:24. Contact: ###-####.
|
BLD02-00493
| BLD-Foundation | 3/24/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/24/2002 at 22:20:30. Contact: ###-####.
already poured 3/25/2002 9:38:24 AM
|
BLD00-03627
| BLD-Conference | 3/22/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | A | PART |
|
|
go over project w/ super. about trades and sprinkler system that is not installed 3/25/2002 6:59:08 AM
|
BLD01-03233
| BLD-Framing/Rough-in | 3/22/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | P | NR |
|
|
fre -re-insp joe ###-####
|
BLD02-00227
| BLD-Energy code compliance | 3/20/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 03/20/2002 at 15:00:27. Contact: .
|
BLD02-00574
| BLD-Framing/Rough-in | 3/25/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | P | PART |
|
|
STEEL REBAR ###-#### CHARITY
|
BLD01-03212
| BLD-Footing | 3/25/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | P | NR |
|
|
###-#### STEVE
|
BLD01-03212
| BLD-Foundation | 3/25/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | P | PART |
|
|
steve ###-####
wip 3/25/2002 1:34:55 PM
|
BLD00-03414
| BLD-Energy code compliance | 3/25/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | P | PASS |
|
|
###-#### BERT
received eng letter on clearance on fireplace chimney, // eng. approved as built because of solid masonary wall w/ airspace built around clay lined flue w/ brick around flue, air space between brick and solid masonary. 3/25/2002 1:42:52 PM
|
BLD01-03212
| BLD-Conference | 3/25/2002 | 3/25/2002 | 3/25/2002 12:00:00 AM | P | PASS |
|
|
side trash enclosure ok if no roof and not over 6' high, about 3 or 4 ft into side set back per Angie w/ p-z 3/25/2002 1:48:45 PM
|