PLM03-03816
| Final | 3/24/2004 | 3/25/2004 | 3/25/2004 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 3/24/2004 at 11:58:22 AM. Contact: ###-####.need to donnect trimmer to water with avb, hard cap abanded water supplies to operatories, cut down back of x-ray developer to insure air gap. sprinkler guy to roll up dcva for testing. need Med gas test and certification from Norco and nitrus and o2 bottles connected 3/25/2004 11:56:36 AM
|
PLM04-00679
| Water and/or Sewer | 3/25/2004 | 3/25/2004 | 3/25/2004 12:00:00 AM | P | FAIL |
|
|
###-#### gary covered up water connection and no approved plumbing plans on site to verify correct interceptor is installed. Gave approval for partial backfilling middle sections of sewer and water line. 3/25/2004 12:45:16 PM
|
PLM03-03816
| Final | 3/25/2004 | 3/25/2004 | 3/25/2004 12:00:00 AM | P | PASS |
|
|
signed temp occ, just need copy of med gas certification from cloverdale/norco to sign final occ and doc final 3/25/2004 4:21:28 PM
|