Inspections for the day of: Thursday, March 25, 2004.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC04-00743 Rough-in3/24/20043/25/20043/25/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 3/24/2004 at 2:03:43 PM. Contact: ###-####.
MEC04-00743 Pressure Test3/24/20043/25/20043/25/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 3/24/2004 at 2:04:15 PM. Contact: ###-####.
MEC04-00742 Rough-in3/24/20043/25/20043/25/2004 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 3/24/2004 at 2:05:12 PM. Contact: ###-####. c/n posted. 3/24/2004 8:18:16 PM
MEC04-00742 Pressure Test3/24/20043/25/20043/25/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 3/24/2004 at 2:05:45 PM. Contact: ###-####.
BLD03-02512 BLD-Final3/24/20043/25/20043/25/2004 12:00:00 AMAPASS
troy ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
MEC04-00769 Final3/24/20043/25/20043/25/2004 12:00:00 AMANR
Andy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes ##Still working.## 3/24/2004 6:30:31 PM
BLD04-00346 BLD-Framing/Rough-in3/24/20043/25/20043/25/2004 12:00:00 AMANR
Andy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes. ##No plans or permit or people to ask, posted c/n and sticker do not cover##. 3/24/2004 6:31:09 PM
BLD04-00335 BLD-Foundation3/24/20043/25/20043/25/2004 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 3/24/2004 at 4:43:16 PM. Contact: ###-####. wip. 3/24/2004 8:00:29 PM
MEC03-02096 Final3/24/20043/25/20043/25/2004 12:00:00 AMANH
after 9:30 please. thanks. Cindy ###-#### this person needs a 1/2 call and this was not noted in the request for inspection I have set this back up for AM with instructions. 3/24/2004 6:55:35 PM
BLD04-00042 BLD-Final3/24/20043/25/20043/25/2004 12:00:00 AMPPASS
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 3/24/2004 2:46:06 PM Ok all signatures on card. 3/24/2004 10:13:24 PM 3/24/2004 10:13:28 PM
BLD04-00041 BLD-Final3/24/20043/25/20043/25/2004 12:00:00 AMPPART
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Temp oc c/n posted ,sink,safety glass,access counter. 3/24/2004 10:12:54 PM
MEC04-00730 Rough-in3/24/20043/25/20043/25/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/24/2004 at 7:49:33 AM. Contact: ###-####.
BLD03-02299 BLD-Final3/25/20043/25/20043/25/2004 12:00:00 AMPPART
larry ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Need detail from architect for canges at door all wall infill also other signatures on job card contractor on site handed a c/n. 3/26/2004 12:57:07 AM
BLD03-01150 BLD-Final3/25/20043/25/20043/25/2004 12:00:00 AMPPASS
nijaz; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
MEC04-00536 Final3/25/20043/25/20043/25/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/25/2004 at 9:12:23 AM. Contact: ###-####.
BLD04-00250 BLD-Framing/Rough-in3/25/20043/25/20043/25/2004 12:00:00 AMPNR
todd; Phone #: ###-#### Internet Inspection Request from: Darla Downs Posted a c/n for plans and foam seal. 3/25/2004 12:36:08 AM
MEC04-00730 Pressure Test3/25/20043/25/20043/25/2004 12:00:00 AMPPASS