FIR08-00048
| INSP-Sprinkler Rough-in/Hydro | 3/25/2008 | 3/25/2008 | 3/25/2008 4:52:02 PM | P | PART |
|
|
OH rough-in approved for cover.
|
FIR07-00935
| INSP-Sprinkler Rough-in/Hydro | 3/25/2008 | 3/25/2008 | 3/25/2008 4:49:32 PM | P | NR |
|
|
Not completed for inspection.
|
FIR06-00587
| INSP-Final Inspection | 3/25/2008 | 3/25/2008 | 3/25/2008 4:47:19 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR08-00109
| INSP-Conference | 3/25/2008 | 3/25/2008 | 3/25/2008 4:45:28 PM | P | DONE |
|
|
Regarding field modifications not reflected on stamped plan set.
|
BLD06-01994
| BLD-Conference | 3/25/2008 | 3/25/2008 | 3/25/2008 12:16:45 PM | A | DONE |
|
|
Project related fire alarm and sprinkler permits are complete, occupancy approval pending satisfactory fire life safety inspection-see fire code review notes attatched to the stamped plan set for requirements and conditions.
|
FIR06-00540
| INSP-Sprinkler Rough-in/Hydro | 3/24/2008 | 3/25/2008 | 3/25/2008 11:59:04 AM | A | PART |
|
|
Accepted photographic documentation of seismic bracing at four locations including the plaza level NE, NW, SE, and SW corner 4-way braces inaccessible for viewing due to confined space and asbestos abatement. Images attached under "Documents"
|
FIR08-00073
| INSP-Final Inspection | 3/24/2008 | 3/25/2008 | 3/25/2008 11:52:17 AM | A | PASS |
|
|
Fire alarm testing passed, main entry door mag lock interconnection to the FACP also tested, permit finaled.
|
BLD08-00428
| FIRE-Conference | 3/24/2008 | 3/25/2008 | 3/25/2008 11:50:13 AM | A | DONE |
|
|
On site conference regarding necessary modifications to the existing fire sprinkler system due to building remodel work.
|