ESC07-00819
| Random Inspection | 3/25/2008 | 3/25/2008 | 3/25/2008 4:18:20 PM | P | PART |
|
|
Discussed with RP over the removal of siltfence along Elder street. Due to weather permitting, they might need to re-install a sediment BMP in place of the silt fence. Told the RP to keep an eye on that particular area. Will re-inspect tomorrow. CAS#460
|
ESC08-00160
| Site Preparation | 3/24/2008 | 3/25/2008 | 3/25/2008 3:24:45 PM | P | PART |
|
|
Spoke with RP over project. There is a irragation channel at the north east point of project that will permitely stabilized with tile. Silt ence put along the irragation canal. Construction entrance put in off of Five mile road. Recommend perimeter control to keep vechiles from driving where there is no construction entrance.
|
ESC07-00744
| Site Final | 3/25/2008 | 3/25/2008 | 3/25/2008 2:29:22 PM | P | PASS |
|
|
Site has no exposed soil. Everything is stabilized. CAS#460
|
ESC07-01530
| Random Inspection | 3/25/2008 | 3/25/2008 | 3/25/2008 2:03:27 PM | P | PASS |
|
|
Silt fence installed around perimeter of project except at fonof project where landscape rock is put in and wattle at the tpo of rock to disturbed area. CAS#460
|
ESC07-00814
| Random Inspection | 3/25/2008 | 3/25/2008 | 3/25/2008 1:36:32 PM | P | PASS |
|
|
Needed to post ESC permit. Everthing elso looks good. Sign post prior beforwe I left. CAS#460
|
ESC08-00159
| Site Preparation | 3/24/2008 | 3/25/2008 | 3/25/2008 1:35:36 PM | A | PART |
|
|
Right next to Iragation canal, told that some type of protection is needed. Also need to stabilize stock piles if they will be sitting for at least 14 day or more. Sigh must be posted at entrance of project. Will be starting in mid April. CAS#460
|
ESC06-01387
| BMP Violation | 3/21/2008 | 3/25/2008 | 3/24/2008 2:54:52 PM | A | CANC |
|
|
|