Inspections for the day of: Tuesday, March 25, 2008.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-00819 Random Inspection3/25/20083/25/20083/25/2008 4:18:20 PMPPART
Discussed with RP over the removal of siltfence along Elder street. Due to weather permitting, they might need to re-install a sediment BMP in place of the silt fence. Told the RP to keep an eye on that particular area. Will re-inspect tomorrow.
CAS#460
ESC08-00160 Site Preparation3/24/20083/25/20083/25/2008 3:24:45 PMPPART
Spoke with RP over project.
There is a irragation channel at the north east point of project that will permitely stabilized with tile. Silt ence put along the irragation canal. Construction entrance put in off of Five mile road. Recommend perimeter control to keep vechiles from driving where there is no construction entrance.
ESC07-00744 Site Final3/25/20083/25/20083/25/2008 2:29:22 PMPPASS
Site has no exposed soil. Everything is stabilized.
CAS#460
ESC07-01530 Random Inspection3/25/20083/25/20083/25/2008 2:03:27 PMPPASS
Silt fence installed around perimeter of project except at fonof project where landscape rock is put in and wattle at the tpo of rock to disturbed area.
CAS#460
ESC07-00814 Random Inspection3/25/20083/25/20083/25/2008 1:36:32 PMPPASS
Needed to post ESC permit. Everthing elso looks good. Sign post prior beforwe I left.
CAS#460
ESC08-00159 Site Preparation3/24/20083/25/20083/25/2008 1:35:36 PMAPART
Right next to Iragation canal, told that some type of protection is needed. Also need to stabilize stock piles if they will be sitting for at least 14 day or more. Sigh must be posted at entrance of project. Will be starting in mid April.
CAS#460
ESC06-01387 BMP Violation3/21/20083/25/20083/24/2008 2:54:52 PMACANC