Inspections for the day of: Wednesday, March 25, 2009.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-01051 INSP-Sprinkler Rough-in3/25/20093/25/20093/25/2009 4:24:23 PMPPART
Overhead rough-in at the boys and girls locker room sheetrock ceilings okayed for cover-see initials on shop drawings.
BLD08-02302 FIRE-Conference3/25/20093/25/20093/25/2009 3:39:56 PMPDONE
Regarding hardware requirements for main entry/exit doors 104 and 105-panic hardware needed per approved plans, notes, door schedule and hardware group as previously discussed due to the "A" occupancy type.
FIR09-00152 INSP-Final Inspection3/25/20093/25/20093/25/2009 3:36:37 PMPFAIL
Notification appliances are not in synchronization as required per NFPA 72, sprinkler tamper and waterflow signals are not descripted correctly at the supervising station-need accurate account information for tamper, supervisory and alarm signals. Remainder of testing completed okay including FACP, SD, MP, etc.
BLD08-02567 FIRE-Final Inspection3/25/20093/25/20093/25/2009 3:28:49 PMPFAIL
Noted seven EM lights at the north and east sides of the tenant improvement remodel are not functional.
BLD09-00249 FIRE-Final Inspection3/24/20093/25/20093/25/2009 3:25:42 PMAPASS
Noted corrections finished, fire life safety passed.
BLD08-00703 FIRE-Final Inspection3/24/20093/25/20093/25/2009 3:24:57 PMAPASS
Correction notice items field verified for compliance, fire life safety finaled.
FIR08-00262 INSP-Final Inspection3/24/20093/25/20093/25/2009 3:23:10 PMAPASS
Final inspection passed per the scope of work indicated, fire sprinkler permit finaled.