BLD09-01336
| FIRE-Final Inspection | 3/25/2010 | 3/25/2010 | 3/26/2010 5:24:51 PM | P | DONE |
|
|
FPP insp. request #: ###-####
|
BLD09-00101
| BLD-Aging Inspection | 3/25/2010 | 3/25/2010 | 3/26/2010 5:16:38 PM | P | DONE |
|
|
Final inspection scheduled.
|
FIR09-00540
| INSP-Sprinkler Rough-in/Hydro | 3/25/2010 | 3/25/2010 | 3/25/2010 3:33:44 PM | P | PART |
|
|
Overhead hydrostatic testing for both the wet and antifreeze systems passed.
|
BLD09-01739
| FIRE-Final Inspection | 3/25/2010 | 3/25/2010 | 3/25/2010 3:30:33 PM | P | NR |
|
|
Need project related fire sprinkler permit final prior to fire life safety approvals.
|
FIR10-00042
| INSP-Sprinkler Rough-in | 3/25/2010 | 3/25/2010 | 3/25/2010 3:29:02 PM | P | PART |
|
|
Ref. NFPA 13 sec. 8.16.4.2.3 regarding inspection activity notes.
|
BLD10-00368
| FIRE-Final Inspection | 3/24/2010 | 3/25/2010 | 3/25/2010 3:25:43 PM | A | PART |
|
|
Fire life safety inspection completed satisfactory, noted corrections finished within the tenant space. Final pending completion and testing of the relocated automatic fire door at the exterior canopy per scope of pemit work.
|
BLD06-03634
| FIRE-Final Inspection | 3/25/2010 | 3/25/2010 | 3/25/2010 3:20:55 PM | A | PASS |
|
|
Fire life safety finaled.
|
FIR02-00018
| INSP-Conference | 3/24/2010 | 3/25/2010 | 3/25/2010 3:17:01 PM | A | DONE |
|
|
Site visit completed- okay to expire permit.
|
FIR09-00649
| INSP-Sprinkler Rough-in | 3/24/2010 | 3/25/2010 | 3/25/2010 3:08:30 PM | A | PART |
|
|
See stamped plan for annotations marked with today's date red-lined as okay for cover- includes six pendent heads at the surgery suite.
|