Inspections for the day of: Thursday, March 25, 2010.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01336 FIRE-Final Inspection3/25/20103/25/20103/26/2010 5:24:51 PMPDONE
FPP insp. request #: ###-####
BLD09-00101 BLD-Aging Inspection3/25/20103/25/20103/26/2010 5:16:38 PMPDONE
Final inspection scheduled.
FIR09-00540 INSP-Sprinkler Rough-in/Hydro3/25/20103/25/20103/25/2010 3:33:44 PMPPART
Overhead hydrostatic testing for both the wet and antifreeze systems passed.
BLD09-01739 FIRE-Final Inspection3/25/20103/25/20103/25/2010 3:30:33 PMPNR
Need project related fire sprinkler permit final prior to fire life safety approvals.
FIR10-00042 INSP-Sprinkler Rough-in3/25/20103/25/20103/25/2010 3:29:02 PMPPART
Ref. NFPA 13 sec. 8.16.4.2.3 regarding inspection activity notes.
BLD10-00368 FIRE-Final Inspection3/24/20103/25/20103/25/2010 3:25:43 PMAPART
Fire life safety inspection completed satisfactory, noted corrections finished within the tenant space. Final pending completion and testing of the relocated automatic fire door at the exterior canopy per scope of pemit work.
BLD06-03634 FIRE-Final Inspection3/25/20103/25/20103/25/2010 3:20:55 PMAPASS
Fire life safety finaled.
FIR02-00018 INSP-Conference3/24/20103/25/20103/25/2010 3:17:01 PMADONE
Site visit completed- okay to expire permit.
FIR09-00649 INSP-Sprinkler Rough-in3/24/20103/25/20103/25/2010 3:08:30 PMAPART
See stamped plan for annotations marked with today's date red-lined as okay for cover- includes six pendent heads at the surgery suite.