ESC06-01461
| Aging Inspection | 3/25/2010 | 3/25/2010 | 3/25/2010 3:32:13 PM | | DONE |
|
|
No activity, but BLD permit is still open.
|
ESC09-00812
| BMP Violation | 3/18/2010 | 3/25/2010 | 3/25/2010 3:12:09 PM | A | PART |
|
|
Liner is still in need of repair. Additional tears have been found in the liner. Also at north end of channel seepage is coming out of the channel. Will re-inspect on 4/2/10AM.
|
ESC10-00046
| BMP Violation | 3/25/2010 | 3/25/2010 | 3/25/2010 2:47:46 PM | P | FAIL |
|
|
Verbal to RP: Pump water out of the area of collection onto the lot where an improper storm drain inlet protection was installed. After all water is out of the area. Install a proper storm drain inlet protection. Willre-inspec t on 3/26/10 PM.
|
ESC09-00356
| Site Preparation | 3/25/2010 | 3/25/2010 | 3/25/2010 1:59:15 PM | | NR |
|
|
|
ESC10-00189
| Site Preparation | 3/18/2010 | 3/25/2010 | 3/25/2010 10:00:49 AM | A | FAIL |
|
|
Verbal to pool company (Ryan): Install storm drain inlet protection at the 2 storm drains at the ned of the driveway. Use any type of city/ACHD approved inlet protection. Will re-inspect on 3/26/10PM.
|
ESC06-01487
| DOC - Permit Finaled | 3/25/2010 | 3/25/2010 | 3/25/2010 9:43:20 AM | P | PASS |
|
|
|
ESC10-00170
| Site Preparation | 3/25/2010 | 3/25/2010 | 3/25/2010 9:38:14 AM | | FAIL |
|
|
Verbal to RP: Remove or install a sediemnt barrier where the stockpile of base rock is on the sidewalk and gutter pan. Make sure to install a sediment barrier along the downward slope of the gutterpan to minumize turbid runoff if not removed or relocated onto the lot. Will re-inspec t on 3/26/10AM.
|
ESC10-00224
| Site Preparation | 3/25/2010 | 3/25/2010 | 3/25/2010 8:44:12 AM | | NR |
|
|
Not starting until 3/30/10. Will re-inspect on the date of 3/30/10.
|