BLD10-02283
| BLD-Conference | 3/25/2011 | 3/25/2011 | 3/25/2011 5:03:05 PM | P | DONE |
|
|
melody Phone #: ###-####
|
BLD11-00264
| BLD-Framing/Rough-in | 3/25/2011 | 3/25/2011 | 3/25/2011 4:58:31 PM | P | PASS |
|
|
matt Phone #: ###-####,, call 1st so Matt can meet on site
|
BLD10-02378
| BLD-Final | 3/25/2011 | 3/25/2011 | 3/25/2011 4:24:32 PM | P | CANC |
|
|
tyler Phone #: ###-#### Re-sched for Mon AM.
|
BLD11-00154
| BLD-Framing/Rough-in | 3/25/2011 | 3/25/2011 | 3/25/2011 3:56:42 PM | P | PART |
|
|
Peter Phone #: ###-#### Framing OK....Advised Peter about Option for 3rd party inspection of foam seal or blower door test....Need paperwork at final. Discussed walls adjacent to attic space for insulation and incapsulation on 6 sides.
|
BLD06-02236
| DOC - Permit Expired | 3/25/2011 | 3/25/2011 | 3/25/2011 9:18:28 AM | P | PASS |
|
|
|