BLD13-00181
| FIRE-Conference | 3/19/2014 | 3/19/2014 | | P | |
|
|
JC at phone #: ###-####
|
FIR13-00682
| INSP-Conference | 3/24/2014 | 3/25/2014 | 4/4/2014 4:44:20 PM | A | DONE |
|
|
Ray McQueen Phone #: ###-####
|
FIR13-00704
| INSP-Final Inspection | 3/24/2014 | 3/25/2014 | 3/25/2014 4:44:11 PM | A | NR |
|
|
Missing riser finish pack including calc stickers, DCVA certification, caps at FDC, sign at outside bell, riser tag, etc., need to complete forward flow, missing escutcheons.
|
FIR14-00084
| INSP-Final Inspection | 3/24/2014 | 3/25/2014 | 3/25/2014 4:40:24 PM | A | NR |
|
|
Noted correction items include; cd setting at one classroom, two overspaced av's at entry vestibules, missing coverage at the womens restroom vestibule, provide relay to mag lock at the SE exit door, post points map, need record of inspection and testing forms, missing knox box.
|
FIR13-00720
| INSP-Sprinkler Rough-in | 3/24/2014 | 3/25/2014 | 3/25/2014 4:35:34 PM | P | PART |
|
|
Overhead work approved for cover. Need to provide QR head per plan at the restroom adjacent to the warehouse area, provide matched temp heads above the open office at one location, remove travel caps. Plans annotated.
|
FIR13-00440
| INSP-Sprinkler Rough-in | 3/24/2014 | 3/25/2014 | 3/25/2014 2:18:01 PM | A | PART |
|
|
Okay to cover overhead work at the first floor sheetrock ceilings "oasis" area and east elevator lobby as clouded and dated on approved plans. Discussed project schedule and hydro testing.
|
FIR13-00696
| INSP-Final Inspection | 3/25/2014 | 3/25/2014 | 3/25/2014 11:14:28 AM | A | PART |
|
|
Alarm and trouble conditions tested satisfactory. Final pending high pressure switch supervisory monitor.
|