FIR14-00154
| INSP-Final Inspection | 3/24/2014 | 3/25/2014 | 3/25/2014 3:02:15 PM | A | PASS |
|
|
Permit finaled
|
FIR14-00014
| INSP-Final Inspection | 3/24/2014 | 3/25/2014 | 3/25/2014 2:34:44 PM | A | FAIL |
|
|
Need to add two audio/visuals and relocated another two and test. Provide as-builts.
|
BLD13-02631
| FIRE-Final Inspection | 3/25/2014 | 3/25/2014 | 3/25/2014 1:25:11 PM | P | PASS |
|
|
life safety passed
|
BLD13-02630
| FIRE-Final Inspection | 3/25/2014 | 3/25/2014 | 3/25/2014 1:24:34 PM | P | PASS |
|
|
life safety passed
|
BLD13-02628
| FIRE-Final Inspection | 3/25/2014 | 3/25/2014 | 3/25/2014 1:22:08 PM | P | PASS |
|
|
life safety passed
|
BLD13-02629
| FIRE-Final Inspection | 3/25/2014 | 3/25/2014 | 3/25/2014 1:17:08 PM | P | PASS |
|
|
life safety passed
|
BLD13-02634
| FIRE-Final Inspection | 3/25/2014 | 3/25/2014 | 3/25/2014 12:28:07 PM | P | PASS |
|
|
life safety passed
|
BLD13-02633
| FIRE-Final Inspection | 3/25/2014 | 3/25/2014 | 3/25/2014 12:27:27 PM | P | PASS |
|
|
life safety passed
|
BLD13-03470
| FIRE-Final Inspection | 3/24/2014 | 3/25/2014 | 3/25/2014 11:06:12 AM | A | PASS |
|
|
life safety passed
|
FIR14-00059
| INSP-Final Inspection | 3/24/2014 | 3/25/2014 | 3/25/2014 11:05:06 AM | A | PASS |
|
|
permit finaled
|
FIR13-00604
| INSP-Final Inspection | 3/24/2014 | 3/25/2014 | 3/25/2014 10:54:48 AM | A | PASS |
|
|
permit finaled
|
FIR14-00159
| INSP-Sprinkler Rough-in | 3/24/2014 | 3/25/2014 | 3/25/2014 10:43:52 AM | A | PASS |
|
|
Rough-in passed. Piping can be covered.
|
BLD13-01293
| FIRE-Final Inspection | 3/24/2014 | 3/25/2014 | 3/25/2014 10:13:47 AM | A | PASS |
|
|
life safety passed
|
BLD13-01292
| FIRE-Final Inspection | 3/24/2014 | 3/25/2014 | 3/25/2014 10:13:23 AM | A | PASS |
|
|
Life safety passed
|
BLD13-03564
| FIRE-Final Inspection | 3/24/2014 | 3/25/2014 | 3/24/2014 1:45:51 PM | A | PASS |
|
|
Life safety passed
|