ESC11-00192
| General Inspection | 3/25/2015 | 3/25/2015 | 3/25/2015 4:31:56 PM | | PASS |
|
|
No trackout from open parcels. 1 active home under construction, two on Heaven's Way getting finishing touches. DI bags have adequate capacity. No corrections at this time.
|
ESC13-01167
| General Inspection | 3/25/2015 | 3/25/2015 | 3/25/2015 4:15:43 PM | | PASS |
|
|
No construciton activity. Home is occupied, but large hillside area is not yet seeded. no issues, but need to seed with native grasses this spring.
|
ESC12-00403
| General Inspection | 3/24/2015 | 3/25/2015 | 3/25/2015 4:03:41 PM | P | PART |
|
|
Need to install DI bag for parking lot on 13th and sweep up trackout.
No trackout from main site, no discharges observed.
|
ESC15-00293
| Site Preparation | 3/25/2015 | 3/25/2015 | 3/25/2015 3:50:15 PM | P | PASS |
|
|
Cary Phone #: ###-####
Approved for construction.
|
ESC14-00802
| Aging Inspection | 3/25/2015 | 3/25/2015 | 3/25/2015 3:04:24 PM | | PASS |
|
|
Structure installed in backyard. No loose sediment or disturbed area at site. No further ESC inspections. ESC conditions satisfied.
|
ESC14-00802
| DOC - Permit Finaled | 3/25/2015 | 3/25/2015 | 3/25/2015 3:03:36 PM | P | PASS |
|
|
|
ESC14-00774
| General Inspection | 3/24/2015 | 3/25/2015 | 3/25/2015 2:51:03 PM | P | PASS |
|
|
Project near completion. Warehouse frame is complete and parking lot and stormwater infrastructure installed. Work is ongoing on interior as well as final site cleanup activities.
No trackout to Executive, no runoff or nonstormwater discharges observed. Trash is contained and no litter or materials blowing around site.
Will need to remove stockpile to east of parking lot next to job trailor and stabilize the disturbed area on the lot before be able to final the ESC permit.
|
ESC14-01023
| General Inspection | 3/25/2015 | 3/25/2015 | 3/25/2015 11:45:32 AM | P | PASS |
|
|
WIP. Foundation poured. Silt fence containing sediment on site and keep sidewalk clean. Workers parking on streets - construction entrance/rock unloading zone is provided. Permit posted. Approved.
|
ESC13-00213
| General Inspection | 3/25/2015 | 3/25/2015 | 3/25/2015 11:30:04 AM | | PART |
|
|
No activity at time of inspection. Gate is locked and no one at home. Some trackout to the culdesac has occured and needs to be cleaned.
New contractor is on job - no current RP listed. Will investigate. No discharges or hillside erosion occuring.
|
ESC14-00614
| Random Inspection | 3/25/2015 | 3/25/2015 | 3/25/2015 11:26:38 AM | P | PASS |
|
|
Hillside silt fence is still trenched in properly. Erosion control blanket is tacked down and grass is still growing through it.
No corrections - just need to continue routine cleanup and housekeeping.
Some trackout from driveway area due to recent rains was being swept at time of inspection.
|
ESC14-00978
| Aging Inspection | 3/25/2015 | 3/25/2015 | 3/25/2015 10:39:07 AM | | PASS |
|
|
WIP. Earthwork complete and no loose sediment/dirt at site. Work area is in backyard of existing home - 2nd story addition. No trackout, discharges, or spills observed.
|
ESC15-00255
| Site Preparation | 3/24/2015 | 3/25/2015 | 3/25/2015 10:35:31 AM | A | PASS |
|
|
Mark Phone #: ###-####
Small structure demolition in backyard of home in order to build new small dwelling unit. Access will be through paved alley. Flat lot, low risk site. Will need to watch flow to inlet at State and Walnut if conditions get muddy.
Permit posted. Homeowner RP, work done by Wood Bros. Approved.
|
ESC13-00230
| General Inspection | 3/25/2015 | 3/25/2015 | 3/25/2015 10:11:58 AM | | PASS |
|
|
Home in progress on Grand Prairie and Playwright currently. Stockpiles from foundations are being stored in contained location to prevent sediment runoff. Lined washout provided for developers (Brighton & Alturus). Roads and gutters free of loose sediment, no hillside erosion observed on upper end.
Approved.
|
ESC15-00320
| Site Preparation | 3/24/2015 | 3/25/2015 | 3/25/2015 10:02:12 AM | A | PASS |
|
|
Shane Phone #: ###-####
Permit posted on gate to old settling pond. Site will use existing construction entrance for Terraces laydown yard.
Will excavate top levels of biosolids in north settling pond to dry out in rows in the south pond. Site has existing earthen berm (abandoned wastewater settling ponds) surrounding entire site creating a sediment barrier. No material will leave site at this time. Once dry, materials will be hauled to dump.
Main BMP will be dust control when disturbing topsoil. Approved. Operation to begin next week.
|
ESC13-00707
| General Inspection | 3/25/2015 | 3/25/2015 | 3/25/2015 7:58:40 AM | | CANC |
|
|
site currently inactive. Inspected 3/24, no issues
|