ELE16-00906
| Final | 3/24/2016 | 3/25/2016 | 3/25/2016 1:21:14 PM | P | PASS |
|
|
Residential- upgrade devices Thank you Phone #: ###-#### Inspection requested via web by Lonnie Sorichta final ok
|
ELE16-00906
| Electrical Rough-In | 3/25/2016 | 3/25/2016 | 3/25/2016 1:15:23 PM | P | PASS |
|
|
Residential- upgrade devices Thank you Phone #: ###-#### Inspection requested via web by Lonnie Sorichta r/i ok
|
ELE13-02192
| ELE-Aging Inspection | 3/25/2016 | 3/25/2016 | 3/25/2016 12:47:18 PM | | DONE |
|
|
left message to call for final
|
ELE16-00798
| Rough-In Permanent Service | 3/25/2016 | 3/25/2016 | 3/25/2016 12:44:12 PM | P | PASS |
|
|
Inspection requested via web by HZ ZAHIC r/i ok p/s u/g n ok
|
ELE16-00797
| Rough-In Permanent Service | 3/25/2016 | 3/25/2016 | 3/25/2016 12:34:32 PM | P | PASS |
|
|
Inspection requested via web by HZ ZAHIC r/i ok p/s u/g n ok
|
ESC14-00928
| Random Inspection | 3/25/2016 | 3/25/2016 | 3/25/2016 10:59:35 AM | P | DONE |
|
|
random track out insp no track out looks clean
|
ELE15-02641
| Electrical Rough-In | 3/24/2016 | 3/25/2016 | 3/25/2016 10:58:51 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton r/i ramp ceiling ok
|
ELE15-03901
| Electrical Rough-In | 3/23/2016 | 3/25/2016 | 3/25/2016 10:12:28 AM | A | PASS |
|
|
Interior wall inspections for 6th and 7th floor, west side of building. Call Joey for inspection. Phone #: ###-#### Inspection requested via web by Rafael Castillo r/i ok look for orange area on plans
|
ELE16-00763
| Electrical Rough-In | 3/24/2016 | 3/25/2016 | 3/25/2016 9:09:22 AM | A | PASS |
|
|
Trench inspection. Trench is between house and new shop. Thank you Phone #: ###-#### Inspection requested via web by Eric Brown r/i u.ground to house ok to cover
|
ELE16-00911
| Electrical Rough-In | 3/24/2016 | 3/25/2016 | 3/25/2016 8:32:51 AM | A | PASS |
|
|
2nd floor offices; walls ; ceilings; Phone #: ###-#### Inspection requested via web by Steve McCloy r/i ok walls and tgrid ceilings ok to cover
|
ELE16-00917
| Temporary Service | 3/24/2016 | 3/25/2016 | 3/25/2016 8:13:35 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Richard Gratiot t/s o/h n ok
|
ELE16-01838
| Electrical Rough-In | 3/25/2016 | 3/25/2016 | 3/25/2016 12:00:00 AM | A | PASS |
|
|
lvl 4. rooms 426, 425, 436, 437, 438, 439, 445, 427, 440, 441, 442, 443, 444, 446, 447, 423, 424, 422, 450, 448, 449, 455, 451, 452, 453 (?)
Lvl 5 507, 505
Lvl 6 602, 603, 607, 608 phone # ###-####0 inspection requested via web by Tom Betty r/i walls ok and 4th floor bqathrooms core and loids ceilings in these rooms see Wayne's prints with highlighted areas
|
ELE16-00911
| Final | 3/24/2016 | 3/25/2016 | 3/24/2016 6:33:02 AM | A | CANC |
|
|
2nd floor offices; walls & ceilings; call when in route if possible. Phone #: ###-#### >> Inspection requested via web by Steve McCloy Inspection cancelled from web by: Steve McCloy
|