FIR15-00905
| INSP-Supply line flush | 3/25/2016 | 3/25/2016 | 3/25/2016 1:20:54 PM | P | PASS |
|
|
The underground flush passed. Steve and I discussed the height of the FDC. I quoted the 4' max height in NFPA 13
|
FIR15-00710
| INSP-Sprinkler Rough-in/Hydro | 3/23/2016 | 3/25/2016 | 3/25/2016 11:10:25 AM | A | PART |
|
|
Sidewall sprinkler head added for the concealed space at the fireplace per the previous correction. Sprinkler protection is required in the master shower or an 8" lintel is to be provided to create a separate compartment. No tenting has been installed so no sprinkler piping is to be covered.
|
BLD15-03505
| FIRE-Final Inspection | 3/24/2016 | 3/25/2016 | 3/25/2016 10:34:11 AM | A | PASS |
|
|
life safety passed
|
BLD16-00197
| FIRE-Final Inspection | 3/24/2016 | 3/25/2016 | 3/25/2016 8:01:58 AM | A | PASS |
|
|
life safety passed. Only two narrow strips of foam matting and large plywood spring board was in the building.
|