Inspections for the day of: Friday, March 25, 2016.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-02399 FIRE-Final Inspection3/24/20163/25/20163/25/2016 2:29:50 PMACANC
Could not complete life fire safety inspection due to FIR permits still in the issued status. Reminded contractors numorous times about FIR permits needing to be finaled before life fire safety inspection can be completed. Inspection request cancelled, life fire safety will be completed after FIR permits are finaled.
BLD15-01521 FIRE-Final Inspection3/25/20163/25/20163/25/2016 2:09:31 PMPPASS
No fire sprinklers, no fire alarm modifications, point of contact has fire extinguisher to put in fire extingiusher cabinet. Final life fire safety inspection passed/complete.
BLD15-02398 FIRE-Final Inspection3/24/20163/25/20163/25/2016 12:10:32 PMAPASS
Fire sprinkler inspections complete (FIR15-00793 for underground, FIR15-00865 for overhead) fire alarm inspection complete (FIR15-00902) fire alarm communicator inspection complete (FIR16-00190) Final life fire safety inspection passed/complete.
FIR16-00085 INSP-Final Inspection3/25/20163/25/20163/25/2016 12:03:56 PMPCANC
Inspection request reshedule with Nathan, Phone #: 2089414511.
FIR16-00190 INSP-Final Inspection3/25/20163/25/20163/25/2016 12:02:05 PMPPASS
Final fire alarm communicator inspection passed/complete.
FIR16-00189 INSP-Final Inspection3/25/20163/25/20163/25/2016 12:01:35 PMPPASS
Final fire alarm communicator inspection passed/complete.
FIR16-00155 INSP-Sprinkler Rough-in3/24/20163/25/20163/25/2016 11:59:44 AMAPASS
Rough in inspection complete, a follow up RTC inspection will need to be scheduled after finish ceilings are complete for cover approval.
FIR16-00114 INSP-Sprinkler Rough-in3/24/20163/25/20163/25/2016 11:59:14 AMAPASS
Rough in inspection complete, a follow up RTC inspection will need to be scheduled after finish ceilings are complete for cover approval.
FIR16-00010 INSP-Sprinkler Rough-in3/24/20163/25/20163/25/2016 11:58:17 AMAPASS
Rough in inspection complete, a follow up RTC inspection will need to be scheduled after finish ceilings are complete for cover approval.
FIR16-00075 INSP-Sprinkler Rough-in3/24/20163/25/20163/25/2016 11:57:38 AMAPASS
Rough in inspection complete, a follow up RTC inspection will need to be scheduled after finish ceilings are complete for cover approval.
FIR16-00186 INSP-Final Inspection3/25/20163/25/20163/25/2016 9:26:57 AMPPASS
Fire alarm system is removed per permit approval/no longer in service, final alarm inspection complete
FIR16-00186 INSP-Alarm Testing3/24/20163/25/20163/25/2016 9:24:03 AMACANC
Inspection request was for a final inspection, canceling this inspection request and generating a final inspection request.
FIR15-00865 INSP-Final Inspection3/24/20163/25/20163/25/2016 9:18:23 AMAPASS
Final fire sprinkler inspection passed/complete
FIR15-00865 INSP-Sprinkler Rough-in3/24/20163/25/20163/25/2016 9:17:41 AMAPASS
Rough to cover inspection complete, approved for cover.
FIR15-00865 INSP-Sprinkler Rough-in/Hydro3/24/20163/25/20163/25/2016 9:16:06 AMAPASS
Overhead hydrostatic test complete, 24 hour air test complete
FIR15-00793 INSP-Final Inspection3/24/20163/25/20163/25/2016 9:13:39 AMAPASS
Underground final inspection complete
FIR15-00793 INSP-Sprinkler Rough-in/Hydro3/24/20163/25/20163/25/2016 9:12:53 AMAPASS
Underground hydrostatic complete