BLD19-00363
| BLD-Framing/Rough-in | 3/25/2020 | 3/25/2020 | 3/25/2020 3:40:20 PM | P | PASS |
|
|
Herb Phone #: ###-####. Interior steel stud framed walls only for 1st. floor office area. No grid or hardlids at this time.
|
BLD20-00440
| BLD-Framing/Rough-in | 3/25/2020 | 3/25/2020 | 3/25/2020 2:57:48 PM | P | PASS |
|
|
please call half hour before // lloyd Phone #: ###-####
|
BLD19-03710
| BLD-Final | 3/24/2020 | 3/25/2020 | 3/25/2020 2:38:56 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Cindi Lee
|
BLD19-03710
| DOC - Permit Finaled | 3/25/2020 | 3/25/2020 | 3/25/2020 2:38:40 PM | P | PASS |
|
|
|
BLD19-00561
| BLD-Energy code compliance | 3/25/2020 | 3/25/2020 | 3/25/2020 2:13:45 PM | P | NR |
|
|
Ed Phone #: ###-####
|
BLD19-00559
| BLD-Energy code compliance | 3/25/2020 | 3/25/2020 | 3/25/2020 2:13:32 PM | P | NR |
|
|
Ed Phone #: ###-####
|
BLD19-00558
| BLD-Energy code compliance | 3/25/2020 | 3/25/2020 | 3/25/2020 2:13:11 PM | P | NR |
|
|
Ed Phone #: ###-####
|
BLD20-00501
| BLD-Footing | 3/25/2020 | 3/25/2020 | 3/25/2020 1:31:03 PM | P | PASS |
|
|
michael Phone #: ###-####
|
BLD18-01027
| BLD-Conference | 3/6/2020 | 3/25/2020 | 3/25/2020 11:04:59 AM | A | DONE |
|
|
|
BLD18-01027
| BLD-Framing/Rough-in | 3/25/2020 | 3/25/2020 | 3/25/2020 11:04:48 AM | A | PART |
|
|
One siding in progressing on level 3 MOB framing. Still needs to firestop and provide UL listing for line sets in RM.3W235 and noted the plumbing pipes in Rm 3W228 not firestopped yet, will require a T rating.
|
BLD19-03460
| BLD-Wall Bracing | 3/25/2020 | 3/25/2020 | 3/25/2020 10:17:22 AM | P | CANC |
|
|
jorge Phone #: ###-####086
|
BLD19-03460
| BLD-Wall Bracing | 3/24/2020 | 3/25/2020 | 3/25/2020 10:17:11 AM | A | FAIL |
|
|
Jorge Phone #: ###-####. No city approved plans on site. reinspection fee issued.
|
BLD20-00265
| BLD-Foundation | 3/24/2020 | 3/25/2020 | 3/25/2020 9:46:18 AM | A | PART |
|
|
jose Phone #: ###-####
|
BLD19-04952
| BLD-Wall Bracing | 3/24/2020 | 3/25/2020 | 3/25/2020 9:18:26 AM | A | FAIL |
|
|
shear // Tyler Phone #: ###-####. Provide the city set of approved plans. Noted several areas with missing fasteners. Provide 8d hot dipped galvanized nails into sill plate. Correction notice issued.
|
BLD20-00055
| BLD-Energy code compliance | 3/23/2020 | 3/25/2020 | 3/25/2020 8:47:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD20-00474
| BLD-Footing | 3/24/2020 | 3/25/2020 | 3/25/2020 8:42:23 AM | A | NR |
|
|
call when on the way // craig Phone #: ###-####. Needs geo tech report submitted to public works for approval of sub grade.
|
BLD19-04907
| BLD-Final | 3/24/2020 | 3/25/2020 | 3/25/2020 8:23:35 AM | A | PASS |
|
|
This if for Final BLD Structural Inspection, the following inspections have previously been finaled for permanent occupancy (Electrical, FLS, FS, Mechanical, Plumbing) Structural is the only remaining for permanent occupancy. Phone #: ###-#### Inspection requested via web by David Hurley. Ok for perm occ.
|
BLD19-03316
| BLD-Final | 3/24/2020 | 3/25/2020 | 3/25/2020 7:42:29 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Ian Franklin Inspection cancelled from web by: Ian Franklin
|