MIS20-00065
| BLD-Conference | 3/11/2020 | 3/25/2020 | 3/27/2020 10:33:04 AM | A | DONE |
|
|
follow up.....//no one working onsite,doesnt look like any work has been going on//will check back//
|
BLD18-02985
| BLD-Blower Door Test Results | 3/25/2020 | 3/25/2020 | 3/26/2020 12:21:16 PM | P | DONE |
|
|
4.72 ACH 50
|
BLD18-02985
| BLD-Final | 3/24/2020 | 3/25/2020 | 3/25/2020 5:10:52 PM | P | DONE |
|
|
Erikc Phone #: ###-####//corrections made//waiting for blower door test ACH, test was completed , ACH was not calculated, will record when ACH is recieved//
|
BLD18-02985
| DOC - Permit Finaled | 3/25/2020 | 3/25/2020 | 3/25/2020 5:09:56 PM | P | PASS |
|
|
corections made///
|
BLD19-04535
| BLD-Energy code compliance | 3/20/2020 | 3/25/2020 | 3/25/2020 3:30:27 PM | P | CANC |
|
|
Air seal - Derek Phone #: ###-####
|
BLD19-04535
| BLD-Framing/Rough-in | 3/20/2020 | 3/25/2020 | 3/25/2020 3:30:16 PM | P | NR |
|
|
Derek Phone #: ###-####//need mechanical passed first, no framing inspection completed, will need to reschedule after mechanical passes//
|
BLD19-04535
| BLD-Other | 3/25/2020 | 3/25/2020 | 3/25/2020 3:26:01 PM | P | PART |
|
|
sofit // Derek Phone #: ###-####//5/8 gyp ok per plans with vents per plans//CN issued for fascia, talked with plan review, will need approval from fire dept for combustible fascia//
|
BLD19-02700
| BLD-Blower Door Test Results | 3/25/2020 | 3/25/2020 | 3/25/2020 2:28:10 PM | P | DONE |
|
|
2.49 ACH 50
|
BLD19-03890
| BLD-Energy code compliance | 3/24/2020 | 3/25/2020 | 3/25/2020 1:22:58 PM | P | PASS |
|
|
Craig Phone #: ###-####//ok to cover when insulation fixed at mechanical chase//let Craig know to get it fixed//
|
BLD19-03890
| BLD-Framing/Rough-in | 3/24/2020 | 3/25/2020 | 3/25/2020 1:22:16 PM | P | PASS |
|
|
Craig Phone #: ###-####//corrections made//
|
BLD19-00534
| BLD-Framing/Rough-in | 3/24/2020 | 3/25/2020 | 3/25/2020 12:49:50 PM | P | NR |
|
|
2ND and 3RD Floor preliminary inspection Phone #: ###-#### Inspection requested via web by Travis Blackburn//discussed framing corrections for cut joists, will need fixed//some fire caulking, need plumbing and fire alarm finished//
|
BLD19-02667
| BLD-Energy code compliance | 3/25/2020 | 3/25/2020 | 3/25/2020 11:49:25 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson
|
BLD19-04743
| BLD-Framing/Rough-in | 3/24/2020 | 3/25/2020 | 3/25/2020 11:45:13 AM | A | PASS |
|
|
Christina Phone #: ###-####
|
BLD19-02700
| BLD-Final | 3/24/2020 | 3/25/2020 | 3/25/2020 11:12:51 AM | A | PART |
|
|
Brandon Phone #: ###-####//ok for temp until easment is vacated//check back 30 days//
|
BLD19-04441
| BLD-Wall Bracing | 3/24/2020 | 3/25/2020 | 3/25/2020 10:49:43 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//need to add hot dip nails to PT//add blocking where noted//will check at framing//
|
BLD19-02407
| BLD-Framing/Rough-in | 3/24/2020 | 3/25/2020 | 3/25/2020 10:30:04 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson
|
BLD19-02667
| BLD-Framing/Rough-in | 3/24/2020 | 3/25/2020 | 3/25/2020 10:22:54 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//insulation ok as well//need to address hole in loist prior to cover let contractor know//
|
BLD20-00223
| BLD-Foundation | 3/24/2020 | 3/25/2020 | 3/25/2020 9:52:12 AM | A | PART |
|
|
Dane Phone #: ###-####
|
BLD19-03422
| BLD-Framing/Rough-in | 3/24/2020 | 3/25/2020 | 3/25/2020 9:29:26 AM | A | NR |
|
|
Complete wall bracing inspection - The hold downs are replaced with epoxy set studs. Inspect building so we can place insulation Phone #: ###-#### Inspection requested via web by John Cloninger/need trades inspections, truss engineering, approved plans onsite//
|
BLD19-03422
| BLD-Wall Bracing | 3/24/2020 | 3/25/2020 | 3/25/2020 9:28:51 AM | A | PEND |
|
|
Complete wall bracing inspection - The hold downs are replaced with epoxy set studs Phone #: ###-#### Inspection requested via web by John Cloninger//need engineers approval for alternate locations of hold downs//
|
MIS18-00477
| DOC - Permit Finaled | 3/25/2020 | 3/25/2020 | 3/25/2020 8:35:38 AM | P | PASS |
|
|
EXPIRED
|
BLD19-03949
| BLD-Final | 3/24/2020 | 3/25/2020 | 3/25/2020 12:00:00 AM | A | CANC |
|
|
Cancel // Christina Phone #: ###-####
|
BLD20-00137
| BLD-Framing/Rough-in | 3/24/2020 | 3/25/2020 | 3/24/2020 12:17:59 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by James Jackson Inspection cancelled from web by: James Jackson
|