Inspections for the day of: Wednesday, March 25, 2020.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01089 General Inspection3/25/20203/25/20203/27/2020 1:15:49 PM CANC
rescheduled
ESC17-01632 Tracking Control3/24/20203/25/20203/26/2020 3:36:45 PMPFAIL
Some additional rock added to construction entrance. No new trackout from site.

- 27th Street has not been swept, lots of sand/dirt from site in gutter, bike lane, and median. Street needs sweeping as well as the right turn to Fairview
- loose trash still along perimeter fence on Fairview

If no corrective actions, will place re-inspection fees on site for follow up inspections conducted until full compliance with requests
ESC19-00160 BMP Violation3/24/20203/25/20203/26/2020 3:34:00 PMPPEND
NOV follow up compliance inspection

Most corrections requested have been completed:

- storm drain sediment bags on south side of Gabrielle have been cleaned
- Entrance to phase has been swep and gravel placed for stabilized entrance
- Piles of trash have been picked up and consolidated
- ESC permit sign posted


Work is scheduled to resume next week. At that time remaining corrections will be complete:

- provide trash box or dumpster as soon as workers arrive for grading and excavation duties
- finish picking up all loose trash and litter within site and stuck in vegetation around perimeter.

No escalation of enforcement necessary, will follow up on site at end of next week to check on trash and housekeeping at site.
ESC19-00236 Aging Inspection3/25/20203/25/20203/26/2020 1:45:16 PM CANC
ESC19-00278 Aging Inspection3/25/20203/25/20203/26/2020 9:00:07 AM DEFR
ESC19-00400 Aging Inspection3/25/20203/25/20203/25/2020 3:13:48 PM PASS
ESC19-00400 DOC - Permit Finaled3/25/20203/25/20203/25/2020 3:13:42 PMPPASS
ESC20-00272 General Inspection3/5/20203/25/20203/25/2020 3:13:06 PMPCANC
check on site mobilization
ESC20-00002 BMP Violation3/25/20203/25/20203/25/2020 11:19:52 AMPDONE
Notified site RP and operator of dumped washout violation.

Corrective actions needed:

- clean up and dispose of dumped washout
- provide new leakproof washout containment or use phase 1-2 washout
- maintain washout, prevent trackout for washout access.
- pay concrete washout violation fine
- designate stockpile storage areas that are not the sidewalk or gutter
- prevent unecessary access/disturbance of graded lots
- post ESC permit signs for project

-
Schedule reinspection with ESC inspector when site is in compliance.

- Required compliance date April 2
ESC19-00678 General Inspection3/5/20203/25/20203/24/2020 9:45:51 AMPCANC