Inspections for the day of: Tuesday, March 26, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE01-04248 Final3/25/20023/26/20023/26/2002 12:00:00 AMAPASS
###-####
ELE01-04210 Final3/25/20023/26/20023/26/2002 12:00:00 AMAPASS
###-####
ELE02-00844 Electrical Rough-In3/25/20023/26/20023/26/2002 12:00:00 AMAPASS
###-#### dickpool bond ok 3/26/2002 1:14:00 PM
ELE02-00488 Electrical Rough-In3/25/20023/26/20023/26/2002 12:00:00 AMAPART
###-#### north end ok 3/26/2002 11:30:11 AM
ELE02-00833 Electrical Rough-In3/25/20023/26/20023/26/2002 12:00:00 AMAFAIL
384*6703 JOE
protection of cable 3/26/2002 9:54:45 AM
ELE02-00115 Final3/26/20023/26/20023/26/2002 12:00:00 AMPPASS
ROGER ###-####
ELE02-00822 Permanent Service3/26/20023/26/20023/26/2002 12:00:00 AMPNR
###-#### Had conf. grounding unused openings and bonding 3/26/2002 2:35:49 PM
ELE02-00850 Temporary Service3/26/20023/26/20023/26/2002 12:00:00 AMPNR
###-#### ROBERT
service appears to be energized znd ungrounded with service entrance conductors at serface with thhn burried 3/26/2002 2:54:23 PM
ELE02-00833 Electrical Rough-In3/26/20023/26/20023/26/2002 12:00:00 AMPNR
Scheduled by Inspector: 336 On 3/26/2002 11:15:12 AM
ELE02-00678 Electrical Rough-In3/26/20023/26/20023/26/2002 12:00:00 AMPPART
###-####
ELE01-03887 Final3/25/20023/26/20023/26/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/25/2002 at 15:09:03. Contact: ###-####.
ELE01-03750 Electrical Rough-In3/25/20023/26/20023/26/2002 12:00:00 AMPPASS
###-####