Inspections for the day of: Tuesday, March 26, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-02961 Final3/20/20023/26/20023/26/2002 12:00:00 AMAFAIL
pop off drain at water heater needs run to outdoors, no access to crawlspace opening from outdoors. 3/25/2002 9:44:54 AM
MEC02-00802 Rough-in3/25/20023/26/20023/26/2002 12:00:00 AMAFAIL
no pt or work complete 3/26/2002 10:49:17 AM
MEC02-00802 Pressure Test3/25/20023/26/20023/26/2002 12:00:00 AMAFAIL
MEC02-00155 Final3/25/20023/26/20023/26/2002 12:00:00 AMAFAIL
$42 reinspection fee for corrections not completed 3/26/2002 9:59:30 AM
MEC02-00801 Rough-in3/25/20023/26/20023/26/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 03/25/2002 at 14:18:32. Contact: ###-####.
MEC01-02334 Final3/25/20023/26/20023/26/2002 12:00:00 AMAPASS
###-####
MEC02-00774 Pressure Test3/25/20023/26/20023/26/2002 12:00:00 AMAPASS
piping ok, no test required 3/26/2002 9:30:51 AM
MEC02-00818 Pressure Test3/25/20023/26/20023/26/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/25/2002 at 17:08:51. Contact: ###-####.
MEC02-00384 Final3/26/20023/26/20023/26/2002 12:00:00 AMPNR
###-#### DALE
MEC02-00621 Final3/26/20023/26/20023/26/2002 12:00:00 AMPPASS
verily 3/26/2002 1:58:37 PM
MEC02-00155 Final3/26/20023/26/20023/26/2002 12:00:00 AMPPASS
Scheduled by Inspector: 350 On 3/26/2002 1:31:59 PM