BLD03-00146
| FIRE-Final Inspection | 3/25/2003 | 3/26/2003 | 3/26/2003 12:00:00 AM | A | PASS |
|
|
george; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD03-00093
| FIRE-Final Inspection | 3/25/2003 | 3/26/2003 | 3/26/2003 12:00:00 AM | A | FAIL |
|
|
###-#### repair exit sign; annual inspection for extinguisher; exit to west requires hardware that is openable from the inside without special knowledge; remove debris from exit hallway 3/26/2003 1:40:32 PM
|
FIR02-00493
| INSP-Supply line flush | 3/25/2003 | 3/26/2003 | 3/26/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 3/25/2003 at 6:15:37 PM. Contact: ###-####.
|
BLD02-00365
| FIRE-Final Inspection | 3/26/2003 | 3/26/2003 | 3/26/2003 12:00:00 AM | P | PASS |
|
|
|
FIR02-00436
| INSP-Sprinkler Rough-in/Hydro | 3/26/2003 | 3/26/2003 | 3/26/2003 12:00:00 AM | P | PART |
|
|
ADAM; Phone #: ###-#### Internet Inspection Request from: Darla Downs hydro okay on overhead and underground 3/26/2003 4:00:53 PM
|
MIS01-00151
| FIR-Final | 3/24/2003 | 3/26/2003 | 3/26/2003 12:00:00 AM | P | CANC |
|
|
Rocky ###-####/Adam ###-#### rescheduled for 3/25/03 3/25/2003 10:55:39 AM
|