MEC07-00932
| Rough-in | 3/26/2007 | 3/26/2007 | 3/26/2007 3:30:18 PM | P | PASS |
|
|
Chad is the contact, Thanks Phone #: ###-#### furnace 2 60# tests ok
|
MEC07-00887
| Rough-in | 3/26/2007 | 3/26/2007 | 3/26/2007 3:05:58 PM | P | PASS |
|
|
Phone #: ###-#### ri 20# test ok
|
MEC07-00886
| Rough-in | 3/26/2007 | 3/26/2007 | 3/26/2007 3:05:25 PM | P | PASS |
|
|
Phone #: ###-#### ri 20# test ok
|
MEC07-00884
| Rough-in | 3/26/2007 | 3/26/2007 | 3/26/2007 3:04:52 PM | P | PASS |
|
|
Phone #: ###-#### ri 20# test ok
|
PLM07-00888
| Water and/or Sewer | 3/26/2007 | 3/26/2007 | 3/26/2007 2:48:35 PM | P | CANC |
|
|
couldnt find sewer stub.
|
MEC07-00933
| Pressure Test | 3/26/2007 | 3/26/2007 | 3/26/2007 2:47:56 PM | P | FAIL |
|
|
jaimie - pls call for entrane; Phone #: ###-#### Internet Inspection Request from: Victoria Beall two cumbustion air openings, one high and one low, 100 sq. in. each, required into furnace closet. combustable foam sealant is not permitted to be installed around furnace flue. 20# test ok.
|
PLM07-00885
| Water and/or Sewer | 3/26/2007 | 3/26/2007 | 3/26/2007 1:47:33 PM | P | PASS |
|
|
Phone #: ###-####
|
PLM07-00885
| Final | 3/26/2007 | 3/26/2007 | 3/26/2007 1:47:17 PM | P | PASS |
|
|
Phone #: ###-####
|
PLM07-00888
| Water and/or Sewer | 3/26/2007 | 3/26/2007 | 3/26/2007 12:00:00 AM | P | CANC |
|
|
Not ready. Thanks! Phone #: ###-####
|