MEC07-00636
| Rough-in | 3/26/2007 | 3/26/2007 | 3/26/2007 8:25:34 PM | P | FAIL |
|
|
jr.; Phone #: ###-#### Internet Inspection Request from: Victoria Beall..grease duct needs slope..full of wires and slag. i called troy and he will look at this duct with me. the engineer needs to redraw plans to match the installation
|
MEC07-00973
| Rough-in | 3/23/2007 | 3/26/2007 | 3/26/2007 8:21:17 PM | P | PART |
|
|
Tim Gregory Phone #: ###-####..posted corrections for r/i...both 20lb gas tests ok
|
MEC07-00743
| Pressure Test | 3/26/2007 | 3/26/2007 | 3/26/2007 8:19:20 PM | P | PASS |
|
|
Mike unit #''''s 212,213.,214,215,216,217,218,219; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
MEC06-03685
| Final | 3/23/2007 | 3/26/2007 | 3/26/2007 8:18:45 PM | P | PASS |
|
|
Mike unit #''''s 228,229,230,231; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
MEC07-00743
| Rough-in | 3/23/2007 | 3/26/2007 | 3/26/2007 8:17:44 PM | P | PASS |
|
|
Mike unit #''''s 212, 213, 214, 215; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
MEC07-00928
| Pressure Test | 3/23/2007 | 3/26/2007 | 3/26/2007 10:03:03 AM | A | FAIL |
|
|
Brian; Phone #: ###-#### Internet Inspection Request from: Stacie Backus..need letter from engineer for fire-pit locations (3)....test holding so i will tag after i receive the information..dixie
|
MEC06-02562
| Final | 3/26/2007 | 3/26/2007 | 3/26/2007 10:01:19 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 3/26/2007 at 6:21:31 AM. Contact: ###-####....ok to occupy this space
|