Inspections for the day of: Monday, March 26, 2007.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC07-00636 Rough-in3/26/20073/26/20073/26/2007 8:25:34 PMPFAIL
jr.; Phone #: ###-#### Internet Inspection Request from: Victoria Beall..grease duct needs slope..full of wires and slag. i called troy and he will look at this duct with me. the engineer needs to redraw plans to match the installation
MEC07-00973 Rough-in3/23/20073/26/20073/26/2007 8:21:17 PMPPART
Tim Gregory Phone #: ###-####..posted corrections for r/i...both 20lb gas tests ok
MEC07-00743 Pressure Test3/26/20073/26/20073/26/2007 8:19:20 PMPPASS
Mike unit #''''s 212,213.,214,215,216,217,218,219; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
MEC06-03685 Final3/23/20073/26/20073/26/2007 8:18:45 PMPPASS
Mike unit #''''s 228,229,230,231; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
MEC07-00743 Rough-in3/23/20073/26/20073/26/2007 8:17:44 PMPPASS
Mike unit #''''s 212, 213, 214, 215; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
MEC07-00928 Pressure Test3/23/20073/26/20073/26/2007 10:03:03 AMAFAIL
Brian; Phone #: ###-#### Internet Inspection Request from: Stacie Backus..need letter from engineer for fire-pit locations (3)....test holding so i will tag after i receive the information..dixie
MEC06-02562 Final3/26/20073/26/20073/26/2007 10:01:19 AMAPART
Scheduled by a contractor via Hello! on 3/26/2007 at 6:21:31 AM. Contact: ###-####....ok to occupy this space