ELE07-00881
| Electrical Rough-In | 3/26/2007 | 3/26/2007 | 3/26/2007 4:35:33 PM | P | DONE |
|
|
john - ditch for cover; Phone #: ###-#### Internet Inspection Request from: Victoria Beall the home owner is confused about where idaho power starts/stops, and where boise city begins. Talked with him and explained the difference.
|
ELE06-04658
| Final | 3/26/2007 | 3/26/2007 | 3/26/2007 4:20:10 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 3/26/2007 at 9:45:56 AM. Contact: ###-####. 1. only the feeder conduit, strapping at jbox in the back of the store needs to be looked at.
|
ELE07-00990
| Conference | 3/26/2007 | 3/26/2007 | 3/26/2007 4:17:46 PM | P | DONE |
|
|
Sean; Phone #: ###-#### Internet Inspection Request from: Stacie Backus talked about new mast, 8' clearence for structures, grounding, and sub panel locations.
|
ELE07-00990
| Electrical Rough-In | 3/26/2007 | 3/26/2007 | 3/26/2007 4:04:57 PM | P | PASS |
|
|
Sean; Phone #: ###-#### Internet Inspection Request from: Stacie Backus kitchen ri ok
|
ELE07-00587
| Electrical Rough-In | 3/23/2007 | 3/26/2007 | 3/26/2007 2:49:20 PM | A | PASS |
|
|
Underground conduit inspection Phone #: ###-#### ug conduit ok
|
ELE07-00987
| Final | 3/26/2007 | 3/26/2007 | 3/26/2007 2:34:01 PM | P | PASS |
|
|
final ok
|
ELE07-00987
| Electrical Rough-In | 3/26/2007 | 3/26/2007 | 3/26/2007 2:32:42 PM | P | PASS |
|
|
Brian; Phone #: ###-#### Internet Inspection Request from: Stacie Backus p/s u/g reconnect ok
|
ELE07-00959
| Electrical Rough-In | 3/22/2007 | 3/26/2007 | 3/26/2007 2:12:25 PM | A | FAIL |
|
|
Need wall cover & concrete floor inspection. Contact Karl Paige. Phone #: ###-#### 358.30 & 330.30 emt/mc not fastened securley in place at boxes within the given parameters of each material.
|
ELE06-04152
| Electrical Rough-In | 3/26/2007 | 3/26/2007 | 3/26/2007 1:14:17 PM | P | PASS |
|
|
Rough-In Inspection WALLS ONLY Phone #: ###-#### 1. hard lids in bathrooms and storage rm ok to cover. 2. stud walls throughout the building ok to cover
|
ELE07-00978
| Electrical Rough-In | 3/23/2007 | 3/26/2007 | 3/26/2007 11:00:28 AM | A | PASS |
|
|
Dino; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ri ok p/s u/g n ok
|
ELE07-00285
| Final | 3/23/2007 | 3/26/2007 | 3/26/2007 10:41:40 AM | A | FAIL |
|
|
Wayne Trench ; Phone #: ###-#### Internet Inspection Request from: Stacie Backus 310.7 conductors shall be identified for direct burial. 110.3B manufacturers instructions-- trailer shall be fed with four wires to the panel
|
ELE07-00953
| Electrical Rough-In | 3/22/2007 | 3/26/2007 | 3/26/2007 9:46:08 AM | A | FAIL |
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles no bld permit
|
ELE07-00953
| Electrical Rough-In | 3/26/2007 | 3/26/2007 | 3/26/2007 9:42:29 AM | P | FAIL |
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles no building permit for this job, it needs one. walls have been sheetrocked, and painted
|
ELE07-00983
| Final | 3/23/2007 | 3/26/2007 | 3/26/2007 8:58:16 AM | A | FAIL |
|
|
Underground conduit inspection for sign power @ Cricket Store. Phone #: ###-#### to shallow, and the entire length shall be uncovered for the inspection
|
ELE07-00185
| Final | 3/23/2007 | 3/26/2007 | 3/26/2007 8:28:34 AM | A | PASS |
|
|
please contact Patrick, thank you Phone #: ###-#### final ok
|