Inspections for the day of: Thursday, March 26, 2009.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-01264 Aging Inspection3/26/20093/26/20093/26/2009 4:12:43 PM DONE
ESC06-01264 DOC - Permit Expired3/26/20093/26/20093/26/2009 4:12:31 PMPPASS
ESC08-00660 General Inspection3/26/20093/26/20093/26/2009 2:52:14 PM PASS
ESC08-00575 General Inspection ESC3/26/20093/26/20093/26/2009 2:49:10 PM PART
Message to RP:
Advised RP over stabilizing stock pile at the back portion of the project area. In inactive for reasons of dust control
ESC08-00750 General Inspection3/26/20093/26/20093/26/2009 2:45:05 PMPFAIL
Verbal to GC: (RP out of Town)
Clean up all hard surfaces of all sediment and debris.
Will re-inspect on 3/24/09AM.
ESC08-00763 General Inspection3/26/20093/26/20093/26/2009 2:44:49 PMPFAIL
Verbal to GC: (RP out of Town)
Clean up all hard surfaces of all sediment and debris.
Will re-inspect on 3/24/09AM.
ESC09-00131 Site Preparation3/26/20093/26/20093/26/2009 1:32:32 PM NR
ESC09-00102 Site Preparation3/19/20093/26/20093/26/2009 1:03:27 PMANR
Left message with RP to get a tentive start date. Will schedule once a date is given.
ESC09-00052 Site Preparation3/26/20093/26/20093/26/2009 10:34:53 AM PART
Verbal to RP:
2. Post "ESC" sign (Vertical Construction) next to there other ESC sign, and also there "Concrete Washout" sign at the washout that they have provided.
2. Re-place there sand bag that is broken open that they are using as external protection for there D.I. within there project area.
Will re-inspect on 2/27/09PM.
ESC08-00718 Complaint Inspection3/26/20093/26/20093/26/2009 9:40:16 AMAFAIL
Correction Notice: (Discussed with RP)
1. Determine and place the right manhole plate on the manhole stub out that is lower than grade.
2. Provide the proper internal and external protection to miniumize turbid run-off from entering the system.
Will re-inspect on 2/27/09PM.
ESC09-00122 Site Preparation3/26/20093/26/20093/26/2009 9:15:51 AMAPART
Verbal to RP:
1. Move ESC sign to the front of access to be visiable from the street.
2. Provide a concrete washout prior to the pour of any concrete or waste products.
will re-inspect on 3/31/09 AM.