ESC09-00750
| General Inspection | 3/26/2010 | 3/26/2010 | 3/26/2010 4:05:24 PM | P | PASS |
|
|
looked ok
|
ESC09-00769
| General Inspection | 3/26/2010 | 3/26/2010 | 3/26/2010 4:04:54 PM | P | CANC |
|
|
wrong address
|
ELE10-00452
| Conference | 3/26/2010 | 3/26/2010 | 3/26/2010 4:03:50 PM | P | DONE |
|
|
Jacob Phone #: ###-#### reviewed adding wiring to new bathroom in basement, and that existing wall wiring would be ok, no esc this project
|
ELE10-00604
| Temporary Service | 3/25/2010 | 3/26/2010 | 3/26/2010 3:19:40 PM | P | PASS |
|
|
thanks! Inspection requested from web by: Stephen Kren Phone #: ###-#### corrections made, t/s u/g n ok
|
ELE10-00480
| Rough-In Permanent Service | 3/26/2010 | 3/26/2010 | 3/26/2010 2:30:38 PM | P | PART |
|
|
Inspection requested from web by: Therrin Robertson Phone #: ###-#### called,contractor will address stapling, attic access, bends in smurf, flush boxes, nail plates, 2' wall for receptacles, grounding metal boxes, labels for disconnects to agree with drawings, then recall for inspection
|
ELE10-00529
| Final | 3/26/2010 | 3/26/2010 | 3/26/2010 1:20:01 PM | P | FAIL |
|
|
Inspection requested from web by: Scott Campbell Phone #: ###-#### called, left correction notice, NEC 110.26 shall provide work space about electrical equipment, NOTE: corrections shall be made within 5 working days or further action will be taken, such as removal of power
|
ELE10-00131
| Electrical Rough-In | 3/25/2010 | 3/26/2010 | 3/26/2010 12:41:04 PM | P | PASS |
|
|
Bud Phone #: ###-####-Ceiling inspection ceiling only ok to cover, no esc this project
|
ELE10-00215
| Final | 3/26/2010 | 3/26/2010 | 3/26/2010 10:46:46 AM | P | PASS |
|
|
key above side door Inspection requested from web by: Chris Berthelot Phone #: ###-#### corrections made, ok to final
|
ELE10-00210
| Electrical Rough-In | 3/25/2010 | 3/26/2010 | 3/26/2010 10:05:24 AM | A | PASS |
|
|
Dan Phone #: ###-#### corrections made, ric ok, no esc this project
|
ELE10-00615
| Rough-In Permanent Service | 3/25/2010 | 3/26/2010 | 3/26/2010 9:37:55 AM | A | CANC |
|
|
John Phone #: ###-#### wrong type request, see ri
|
ELE10-00615
| Electrical Rough-In | 3/26/2010 | 3/26/2010 | 3/26/2010 9:27:57 AM | A | FAIL |
|
|
John Phone #: ###-#### called ,NEC 210.11(C) bath receptacles shall be on 20A circuits, 300.14 shall provde min 6" free conductor length at boxes, no esc this project
|
ELE10-00577
| Electrical Rough-In | 3/25/2010 | 3/26/2010 | 3/26/2010 9:15:46 AM | A | PASS |
|
|
Tony Phone #: ###-#### ric ok, ok to cover u/g, no esc this project
|
ELE10-00215
| Final | 3/25/2010 | 3/26/2010 | 3/26/2010 8:51:05 AM | A | NH |
|
|
Inspection requested from web by: Chris Berthelot Phone #: ###-#### called, left message, fee due, left card
|
ELE10-00064
| Electrical Rough-In | 3/25/2010 | 3/26/2010 | 3/26/2010 8:21:14 AM | A | PART |
|
|
mike - swimming pool bonding Phone #: ###-#### bonding ok for rope supports and ladders, will call back for diving boards later, no esc
|
ELE09-02110
| Electrical Rough-In | 3/25/2010 | 3/26/2010 | 3/26/2010 7:32:23 AM | A | CANC |
|
|
Please call to meet
Desk ###-####
Cell ###-#### Inspection requested from web by: mark morris Phone #: ###-#### Inspection cancelled from web by: mark morris
|