FIR09-00536
| INSP-Sprinkler Rough-in | 3/26/2010 | 3/26/2010 | 3/26/2010 5:43:04 PM | P | PART |
|
|
See clouded areas marked on stamped plan set at the second floor level classrooms okayed for ceiling cover- Includes rough-in and final head locations. Classroom 202 at the south end is not approved for cover due to exposed combustible construction above the drop ceiling lacking protection. Seismic brace locations at the feed mains in the basement riser room are acceptable.
|
FIR06-00898
| INSP-Final Inspection | 3/26/2010 | 3/26/2010 | 3/26/2010 5:32:47 PM | P | PASS |
|
|
Fire sprinkler permit work okay for final status, project completed. Final inspections passed.
|
FIR06-00898
| INSP-Conference | 3/26/2010 | 3/26/2010 | 3/26/2010 5:31:16 PM | P | DONE |
|
|
|
FIR05-00787
| INSP-Final Inspection | 3/26/2010 | 3/26/2010 | 3/26/2010 5:30:45 PM | P | PASS |
|
|
Underground fire supply line permit final approved.
|
FIR05-00787
| INSP-Conference | 3/26/2010 | 3/26/2010 | 3/26/2010 5:29:51 PM | P | DONE |
|
|
Regarding permit status and conditions on parcel hold for this address.
|
BLD09-00101
| FIRE-Final Inspection | 3/26/2010 | 3/26/2010 | 3/26/2010 5:28:55 PM | P | PASS |
|
|
Life safety finaled, inspection passed.
|
BLD09-01336
| FIRE-Final Inspection | 3/25/2010 | 3/26/2010 | 3/26/2010 5:28:00 PM | A | PASS |
|
|
Life safety inspection completed satisfactory. Noted some site work incomplete. Existing hydrant locations approved per M. Sentenno- see plan review comments.
|
BLD10-00368
| FIRE-Final Inspection | 3/26/2010 | 3/26/2010 | 3/26/2010 5:23:57 PM | A | PART |
|
|
ref. NFPA 80 regarding min. and max closure rate for the relocated fire door- (6"/sec. - 24"/sec.).
|
FIR09-00540
| INSP-Sprinkler Rough-in/Hydro | 3/25/2010 | 3/26/2010 | 3/26/2010 5:18:43 PM | A | PART |
|
|
Remote FDC piping hydrostatic test completed satisfactory.
|
BLD08-01553
| FIRE-Final Inspection | 3/26/2010 | 3/26/2010 | 3/26/2010 3:44:11 PM | A | PASS |
|
|
Correction item site verified for completion, fire life safety finaled. Notified structural inspector of project status change.
|