Inspections for the day of: Friday, March 26, 2010.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00690 FIR-Aging Inspection3/26/20103/26/20104/2/2010 9:34:33 AM NR
Tim Frost sent an email request for status of project.
FIR04-00756 FIR-Aging Inspection3/26/20103/26/20103/31/2010 10:48:06 AM NR
Information was forwarded to Scott Arellano for further action.
FIR09-00707 INSP-Sprinkler Rough-in3/26/20103/26/20103/26/2010 3:28:19 PMPPASS
see the city approved plans for piping the is ok for cover.
FIR10-00014 INSP-Sprinkler Rough-in3/25/20103/26/20103/26/2010 1:21:57 PMAPASS
The sprinkler piping as marked on the plans can be covered. The through bolts for the earth quake bracing have been addressed.
BLD09-00945 FIRE-Final Inspection3/26/20103/26/20103/26/2010 1:21:07 PMPPART
Phase 8 life safety passed. The floor plans have been resubmitted and approved for plan modifications as requested. I discussed with Darren that the additional exit signs as marked by the plan reviewer in the phase 9 and 10 area corridors will be required prior to final.
BLD10-00354 FIRE-Conference3/25/20103/26/20103/26/2010 12:52:44 PMADONE
Discussed door hardware issues with Matt.
BLD09-01241 FIRE-Final Inspection3/25/20103/26/20103/26/2010 11:03:03 AMAPASS
Life safety passed.
FIR09-00534 INSP-Final Inspection3/26/20103/26/20103/26/2010 11:02:42 AMPPASS
Permit finaled