BLD12-03022
| FIRE-Conference | 3/26/2013 | 3/26/2013 | 3/28/2013 5:12:53 PM | P | DONE |
|
|
On site conversation with contractor regarding fire sprinkler system modifications necessary due to remodel work.
|
BLD12-02106
| FIRE-Final Inspection | 3/26/2013 | 3/26/2013 | 3/27/2013 9:09:32 AM | P | PASS |
|
|
Scope of work completed. Life safety passed, no signature card available on site.
|
BLD12-02618
| FIRE-Final Inspection | 3/26/2013 | 3/26/2013 | 3/27/2013 9:07:28 AM | P | PASS |
|
|
Fire life safety finaled. New door hardware can be verified at structural final as discussed.
|
FIR13-00048
| INSP-Final Inspection | 3/25/2013 | 3/26/2013 | 3/26/2013 2:53:33 PM | A | PASS |
|
|
Scope of fire alarm work passed functional testing. Permit finaled.
|
BLD13-00490
| FIRE-Final Inspection | 3/25/2013 | 3/26/2013 | 3/26/2013 2:49:34 PM | A | FAIL |
|
|
Correction items include; post exit signage per stamped plans, provide fire extinguisher with current tag as discussed, post "door to remain...." signage at the main entry/exit.
|
BLD12-01772
| FIRE-Conference | 3/25/2013 | 3/26/2013 | 3/26/2013 2:46:52 PM | A | DONE |
|
|
On site conference with contractors regarding plan review red-line comments, fire extinguisher placement, premise identification, entrance gate, etc. A plan modification shoud be done to include the removal of one door between the east side offices and affected exiting.
|
BLD12-03060
| FIRE-Final Inspection | 3/25/2013 | 3/26/2013 | 3/26/2013 2:42:46 PM | A | PASS |
|
|
Fire life safety final approved.
|
FIR13-00131
| INSP-Final Inspection | 3/22/2013 | 3/26/2013 | 3/26/2013 2:41:21 PM | A | PASS |
|
|
Field verified corrections are finished. Fire sprinkler permit finaled.
|
FIR12-00478
| FIR-Aging Inspection | 3/26/2013 | 3/26/2013 | 3/26/2013 12:12:45 PM | | CANC |
|
|
|