BLD15-00871
| FIRE-Final Inspection | 3/26/2015 | 3/26/2015 | 3/26/2015 5:51:59 PM | P | FAIL |
|
|
Need to meet provisions indicated by plan review red-line annotations and per general requirements list. Not ready for final at this time, no work has been completed. Discussion with applicant on site regarding conditions necessary for occupancy approval.
|
FIR14-00837
| INSP-Final Inspection | 3/24/2015 | 3/26/2015 | 3/26/2015 5:42:06 PM | A | FAIL |
|
|
Need to relocate the SD at the 3rd floor elevator lobby a min. of 3' from the HVAC diffuser, basement elevator lobby SD needs mounted at the deck. 1st floor lobby and machine room smokes tested okay.
|
FIR15-00166
| INSP-Sprinkler Rough-in | 3/25/2015 | 3/26/2015 | 3/26/2015 5:36:45 PM | A | PART |
|
|
Scope of permit work okayed for cover.
|