Inspections for the day of: Thursday, March 26, 2015.
Number of inspections: 17
Percentage of inspections complete: 94 %
Percentage of inspections not complete: 6 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-01938 BLD-Energy code compliance3/26/20153/26/20153/27/2015 6:23:13 AMPPASS
Area 1 level 3 Insulation Phone #: ###-#### Inspection requested via web by Julian Lopez
BLD14-01937 BLD-Framing/Rough-in3/26/20153/26/20153/27/2015 6:22:00 AMPPART
Area 2 level 4 framing Phone #: ###-#### Inspection requested via web by Julian Lopezok to insulate ceiling
BLD13-03405 BLD-Conference3/26/20153/26/20153/27/2015 6:20:18 AMPDONE
Lobby wall types and fire rating Phone #: ###-#### Inspection requested via web by Tim Toups
BLD15-00835 BLD-Foundation3/26/20153/26/20153/26/2015 2:35:11 PMPPASS
Trent Phone #: ###-####
GCB15-00027 GCB-Fndatn/slab ins/fld vent3/25/20153/26/20153/26/2015 1:15:50 PMPPASS
Raul ###-####
GCB15-00006 GCB-Fndatn/slab ins/fld vent3/25/20153/26/20153/26/2015 1:15:18 PMPCANC
Raul ###-####
BLD15-00892 BLD-Conference3/26/20153/26/20153/26/2015 1:14:54 PMPPASS
Phone #: ###-#### Inspection requested via web by Ira Rutledge
BLD15-00892 DOC - Permit Finaled3/26/20153/26/20153/26/2015 1:14:35 PMPPASS
BLD15-00261 BLD-Framing/Rough-in3/25/20153/26/20153/26/2015 1:01:12 PMANR
Phone #: ###-####
BLD15-00579 BLD-Final3/25/20153/26/20153/26/2015 9:46:15 AMAPASS
Tom Phone #: ###-####
BLD15-00579 DOC - Permit Finaled3/26/20153/26/20153/26/2015 9:44:42 AMPPASS
BLD15-00297 BLD-Wall Bracing3/25/20153/26/20153/26/2015 8:59:47 AMAPASS
Shear // Jed Phone #: ###-####
GCB15-00027 GCB-Footing3/25/20153/26/20153/26/2015 8:58:41 AMAPASS
Raul ###-####
MIS15-00070 DOC - Permit Finaled3/26/20153/26/20153/26/2015 8:22:26 AMPPASS
BLD13-03405 BLD-Framing/Rough-in3/25/20153/26/20153/26/2015 7:10:51 AMACANC
Stair #1 framing Phone #: ###-#### >> Inspection requested via web by Tim Toups Inspection cancelled from web by: Tim Toups
MIS15-00071 BLD-Conference3/25/20153/26/20153/25/2015 4:10:16 PMADONE
Please post stop work order
GCB14-00159 GCB-Framing3/26/20153/26/2015 P