PLM18-01216
| Plumbing Rough-in | 3/26/2018 | 3/26/2018 | 3/26/2018 4:28:11 PM | P | PASS |
|
|
plumber onsight, located in basement Phone #: ###-#### Inspection requested via web by Mike Dunson
|
PLM18-00974
| Final | 3/23/2018 | 3/26/2018 | 3/26/2018 4:03:14 PM | P | PASS |
|
|
**WANTS AFTER 2:30PM*** Debbie Gamel. ###-####
MASTER BATH REMODEL FINAL TRIM ; GUEST BATH NEW LAV ; TOILET. Phone #: ###-#### Inspection requested via web by Chris Field
|
PLM18-01155
| Water Heater Final | 3/21/2018 | 3/26/2018 | 3/26/2018 3:53:45 PM | P | FAIL |
|
|
Please call Rhonda when on way ###-#### Phone #: ###-#### Inspection requested via web by Scott Ferguson. Install a 3" drip leg on the gas line to the water heater. Can go at the gas valve. Take a picture, reschedule and send me a picture.
|
PLM18-01212
| Plumbing Rough-in | 3/26/2018 | 3/26/2018 | 3/26/2018 3:31:56 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by robert goodson
|
PLM18-01145
| Plumbing Rough-in | 3/23/2018 | 3/26/2018 | 3/26/2018 2:56:04 PM | P | PASS |
|
|
JOB # 51230 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM18-01218
| Pressure Test | 3/26/2018 | 3/26/2018 | 3/26/2018 2:26:54 PM | P | PASS |
|
|
Please call before heading out. Cory @2086156557 or Amanda @2086156545 Phone #: ###-#### Inspection requested via web by Cory Ogden. 20# test
|
PLM18-01215
| Plumbing Rough-in | 3/26/2018 | 3/26/2018 | 3/26/2018 2:12:43 PM | P | PASS |
|
|
please call before heading over Cory at 2086156557 or Amanda at 2086156545 Phone #: ###-#### Inspection requested via web by Cory Ogden
|
PLM18-01062
| Groundwork | 3/26/2018 | 3/26/2018 | 3/26/2018 1:42:27 PM | P | PASS |
|
|
If there are any questions please contact Jerry P. at ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM18-01114
| Final | 3/23/2018 | 3/26/2018 | 3/26/2018 11:54:05 AM | A | PASS |
|
|
Peter Phone #: ###-####
|
PLM18-01179
| Final | 3/23/2018 | 3/26/2018 | 3/26/2018 11:08:29 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
PLM18-01164
| Water Heater Final | 3/21/2018 | 3/26/2018 | 3/26/2018 10:38:55 AM | A | PASS |
|
|
PLEASE CALL BEFORE ARRIVAL. THANK YOU Phone #: ###-#### Inspection requested via web by JEREMY LINK
|
PLM18-00752
| Groundwork | 3/23/2018 | 3/26/2018 | 3/26/2018 10:18:18 AM | A | PART |
|
|
PHIL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. water service into the building ok. recall after the connection outside of the building to the water service
|
PLM18-01162
| Plumbing Rough-in | 3/25/2018 | 3/26/2018 | 3/26/2018 10:18:18 AM | A | FAIL |
|
|
Building H the top left of the building is units 1, 3, 5 the bottom left units 2, 4 and 6. To get in all you have to do is pick up the fence and move it, its really easy. All new water, new tub, and only vents out the roof. That is all for the roughin. Please call if you have any questions. If I dont answer please leave a message and I will get back with you as soon as I can. Thanks Dan Phone #: ###-#### Inspection requested via web by Ryan Baker. 1. The t&p in unit H6 is backgrading. 2. Pipe the T&P and drain pans on all first floor units to the outside. 3. Bring the irrigation backflow up to code. PVB, Double check or RP.
|
PLM17-04592
| Plumbing Rough-in | 3/23/2018 | 3/26/2018 | 3/26/2018 8:59:00 AM | A | PASS |
|
|
BRECK IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
PLM17-01857
| PLM-Aging Inspection | 3/26/2018 | 3/26/2018 | 3/26/2018 8:37:26 AM | | PASS |
|
|
|
PLM17-01857
| DOC - Permit Finaled | 3/26/2018 | 3/26/2018 | 3/26/2018 8:37:08 AM | P | PASS |
|
|
|
PLM18-01025
| Final | 3/22/2018 | 3/26/2018 | 3/23/2018 12:09:24 PM | A | CANC |
|
|
Please call the customer when on way. Mark ###-####. Mechanical Final scheduled as well. Phone #: ###-#### >> Inspection requested via web by Krista Boss Inspection cancelled from web by: Krista Boss
|