ELE19-00817
| Electrical Rough-In | 3/26/2019 | 3/26/2019 | 3/26/2019 2:19:52 PM | P | PASS |
|
|
2 inch conduit behind sheetrock. other electrical contractors are working in the same area look at our installation only Phone #: ###-#### Inspection requested via web by Shawna Gates Stair walls rough in ok cover
|
ELE19-00975
| Electrical Rough-In | 3/26/2019 | 3/26/2019 | 3/26/2019 1:38:43 PM | P | PASS |
|
|
Please call 30 minutes ahead if possible. Dan Hommel is the contact Phone #: ###-#### Inspection requested via web by Kerri Hamilton Clubhouse rough in ok cover
|
ELE19-00933
| Rough-In Permanent Service | 3/25/2019 | 3/26/2019 | 3/26/2019 9:47:38 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk Rough in ok cover p/s u/g n ok
|
ELE19-01038
| Temporary Service | 3/25/2019 | 3/26/2019 | 3/26/2019 8:33:06 AM | A | FAIL |
|
|
Temp Pole Is Set And Ready For Inspection Phone #: ###-#### Inspection requested via web by jason shifflett 250.24(A)- Grounding electrode conductor shall be connected to the grounded conductor. Main bonding jumper needed.
|