ELE19-00470
| Electrical Rough-In | 3/26/2019 | 3/26/2019 | 3/26/2019 1:58:30 PM | P | PASS |
|
|
Under tile floor heat in master bathroom Phone #: ###-#### Inspection requested via web by steve sellers Ok cover flr heat mstr.
|
ELE19-01041
| Electrical Rough-In | 3/26/2019 | 3/26/2019 | 3/26/2019 11:22:26 AM | P | PASS |
|
|
Danny. Wall cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Ok cover bathroom.
|
ELE19-00989
| Final | 3/26/2019 | 3/26/2019 | 3/26/2019 11:22:03 AM | P | PASS |
|
|
Please final out permit Phone #: ###-#### Inspection requested via web by Kendra Lanham Ok final. OSB was used to protect SER on left side of panel. A permanent trim ring is to be installed around meter base.
|
ELE19-00664
| Rough-In Permanent Service | 3/25/2019 | 3/26/2019 | 3/26/2019 10:28:14 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jim Williams p/s u/g n ok
|
ELE16-03150
| Final | 3/26/2019 | 3/26/2019 | 3/26/2019 9:56:16 AM | P | PASS |
|
|
Ok final. Final tag was in panel from previous inspection. Somehow it didnt final out in system.
|
ELE16-03292
| ELE-Aging Inspection | 3/26/2019 | 3/26/2019 | 3/26/2019 9:17:06 AM | | DONE |
|
|
Contacted Lewis. Sent him address and perm number to coordinate a final.
|
ELE16-03642
| ELE-Aging Inspection | 3/26/2019 | 3/26/2019 | 3/26/2019 9:13:23 AM | | DONE |
|
|
Spoke with contractor on phone. He is going to get a hold of Jessie of Alt Ener and coordinate a final for electrical.
|
ELE16-03274
| ELE-Aging Inspection | 3/26/2019 | 3/26/2019 | 3/26/2019 9:12:34 AM | | DONE |
|
|
Talked to contractor. Asked him to contact homeowner in the next week or so to final out this permit. Homeowner will need to pull a permit, as he is buying and hanging his own fixtures.
|
ELE18-04690
| Final | 3/25/2019 | 3/26/2019 | 3/26/2019 8:57:37 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Andrea Creek Ok final. Corrections made.
|