MEC00-00921
| Final | 3/24/2000 | 3/27/2000 | 3/27/2000 12:00:00 AM | A | FAIL |
|
|
richard ###-#### C/N- gas furn. @ prohibited location (bath) per UMC 304.5, called TML refer to "325". 3/27/00 4:30:31 PM
|
BLD00-00346
| BLD-Framing/Rough-in | 3/24/2000 | 3/27/2000 | 3/27/2000 12:00:00 AM | A | PART |
|
|
shear wall dwane ###-#### Siding ok. 3/27/00 4:29:54 PM
|
BLD00-00629
| BLD-Footing | 3/24/2000 | 3/27/2000 | 3/27/2000 12:00:00 AM | A | PART |
|
|
###-#### jed Set backs appear ok, no plan 3/27/00 4:29:45 PM
|
BLD98-01674
| BLD-Final | 3/24/2000 | 3/27/2000 | 3/27/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/24/2000 at 15:22:06. Contact: ###-####. N/R 3/28/00 9:16:31 AM
|
BLD99-02658
| BLD-Final | 3/24/2000 | 3/27/2000 | 3/27/2000 12:00:00 AM | P | FAIL |
|
|
julio ###-#### Need other finals. 3/28/00 9:18:53 AM
|
BLD00-00359
| BLD-Framing/Rough-in | 3/27/2000 | 3/27/2000 | 3/27/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/27/2000 at 08:06:36. Contact: ###-####. No plans, all blocking. 3/28/00 9:16:53 AM
|
BLD00-00325
| BLD-Conference | 3/27/2000 | 3/27/2000 | 3/27/2000 12:00:00 AM | P | FAIL |
|
|
###-#### Ron or ###-#### No one onsite; called?? 3/28/00 9:16:43 AM
|
BLD00-00691
| BLD-Framing/Rough-in | 3/27/2000 | 3/27/2000 | 3/27/2000 12:00:00 AM | P | PART |
|
|
Donna Weston ###-#### No plans, detached gar. 3/28/00 9:17:20 AM
|
BLD00-00067
| BLD-Other | 3/27/2000 | 3/27/2000 | 3/27/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/27/2000 at 09:50:32. Contact: ###-####. Shear ok. 3/28/00 9:16:22 AM
|
BLD00-00403
| BLD-Framing/Rough-in | 3/27/2000 | 3/27/2000 | 3/27/2000 12:00:00 AM | P | FAIL |
|
|
CALL FIRST ###-#### Add draft stops, ok to insul. 3/28/00 9:19:53 AM
|