Inspections for the day of: Tuesday, March 27, 2001.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Lightfoot
TitleMEC-STR/MEC INSPECTOR
Phone #794-9463
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-00384 Rough-in3/26/20013/27/20013/27/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 03/26/2001 at 09:57:03. Contact: ###-####. area 7 and 8 2nd floor 3/27/2001 11:42:11 AM
MEC01-00840 Final3/26/20013/27/20013/27/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/26/2001 at 12:28:45. Contact: . c/n posted 3/27/2001 11:41:19 AM
MEC01-00753 Final3/26/20013/27/20013/27/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 03/26/2001 at 14:20:36. Contact: ###-####. c/n posted 3/27/2001 11:40:31 AM
MEC01-00850 Final3/26/20013/27/20013/27/2001 12:00:00 AMAPASS
Final reinspect - Don, ###-#### - call 1st sign occ card 3/27/2001 11:40:51 AM
MEC01-00846 Pressure Test3/27/20013/27/20013/27/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/27/2001 at 08:59:11. Contact: ###-####. underground gas pipe portion ok 3/27/2001 1:55:43 PM
MEC01-00809 Final3/27/20013/27/20013/27/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/27/2001 at 09:06:18. Contact: ###-####. resize gas pipe 3/27/2001 1:56:42 PM
MEC01-00875 Final3/27/20013/27/20013/27/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/27/2001 at 10:56:39. Contact: ###-####. not ready 3/27/2001 1:56:06 PM