MIS01-00053
| BLD-Conference | 3/27/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | | PASS |
|
|
reduced shed to 120 sq. ft. NO PERMITS NEEDED. PER TOM ARCORACI. ###-####
|
MIS00-00266
| BLD-Conference | 3/20/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | A | FAIL |
|
|
Code enforcement confirms new apartment construction on left side of building. Place a SWO. 325 stop work issued double fee 3/27/2001 10:06:48 AM
|
BLD00-03519
| BLD-Footing | 3/26/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 11:51:43. Contact: ###-####. wip mti on site 3/27/2001 9:53:17 AM
|
BLD01-00097
| BLD-Other | 3/26/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | A | PASS |
|
|
Don Bryan, ###-#### - ceiling inspection grid ok 3/27/2001 10:20:30 AM
|
MEC00-01737
| Final | 3/26/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | A | PASS |
|
|
Ryan King ###-#### there is a key underneath the sprinkler bib that comes out from underneath the house under a rock.
|
BLD01-00231
| BLD-Final | 3/26/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | P | NR |
|
|
Don, ###-####, call 1st
|
BLD00-03538
| BLD-Concrete | 3/26/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 16:29:41. Contact: ###-####. wip spec insp 3/27/2001 1:45:15 PM
|
BLD00-00662
| BLD-Conference | 3/27/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | P | PART |
|
|
###-####\\conf only handrail ext conf need app plans for detail to meet cabo ansi 3/27/2001 1:42:21 PM
|
BLD00-03114
| BLD-Framing/Rough-in | 3/27/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | P | PASS |
|
|
###-#### shear wall
|
BLD00-03109
| BLD-Framing/Rough-in | 3/27/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | P | FAIL |
|
|
###-#### cn posted 3/27/2001 3:25:05 PM
|