MEC01-00759
| Rough-in | 3/26/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 11:17:20. Contact: ###-####.
|
MEC01-00759
| Pressure Test | 3/26/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 11:17:44. Contact: ###-####.
|
BLD00-03144
| BLD-Framing/Rough-in | 3/26/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 11:18:30. Contact: ###-####.
|
BLD00-00616
| BLD-Final | 3/26/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 12:07:26. Contact: ###-####. C. of C #21413 issued. 3/27/2001 9:08:24 AM
|
BLD01-00006
| BLD-Wall cover | 3/26/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/26/2001 at 14:37:39. Contact: ###-####. C/N posted on site. 3/27/2001 10:06:47 AM
|
BLD01-00622
| BLD-Footing | 3/27/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/27/2001 at 06:48:27. Contact: ###-####. wip 3/27/2001 11:16:41 AM
|
BLD01-00409
| BLD-Footing | 3/27/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 03/27/2001 at 07:15:50. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/27/2001 at 07:20:54.
|
BLD00-03199
| BLD-Final | 3/27/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/27/2001 at 07:23:25. Contact: ###-####. C/n posted-landing outside b.room, attic access sealed in garage. 3/27/2001 9:02:00 AM
|
MEC01-00812
| Rough-in | 3/27/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 420 On 3/27/2001 11:50:40 AM
|
BLD00-02587
| BLD-Energy code compliance | 3/27/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | P | PASS |
|
|
tim wilson-- ==###-#### Prior c/n items corrected. 3/27/2001 2:05:19 PM
|
BLD01-00365
| BLD-Footing | 3/27/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | P | PASS |
|
|
Randy ###-####
|
MIS01-00055
| BLD-Final | 3/27/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | P | PASS |
|
|
fn occ-- robert-- ###-####--call 1st before insp--Mis. Checklist to remove existing garage. 3/27/2001 1:21:41 PM
|
BLD01-00378
| BLD-Framing/Rough-in | 3/27/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | P | PART |
|
|
###-####Shear--C/N posted-garage front hd are not per plan, back side of garage needs OSB --Ok to side except garage front. 3/27/2001 3:19:19 PM
|
BLD01-00415
| BLD-Energy code compliance | 3/27/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | P | PASS |
|
|
Wade ###-####
|
BLD01-00409
| BLD-Footing | 3/27/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/27/2001 at 07:22:07. Contact: ###-####. wip 3/27/2001 2:42:33 PM
|
BLD01-00505
| BLD-Foundation | 3/26/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | P | PART |
|
|
michael ###-#### wip-hd not installed at time of inspection. 3/27/2001 12:05:29 PM
|
BLD00-01186
| BLD-Framing/Rough-in | 3/26/2001 | 3/27/2001 | 3/27/2001 12:00:00 AM | P | NR |
|
|
Carl ###-#### carl call 3/26 2001 and made a appointment w/301 to be there for insp. at 4:30 pm / I added this note if insp. is trans. to someone else. 3/27/2001 10:53:23 AM
|
BLD01-00083
| BLD-Framing/Rough-in | 3/22/2001 | 3/27/2001 | 3/23/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 03/22/2001 at 13:45:22. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/23/2001 at 07:29:29.
|