PLM02-00758
| Water and/or Sewer | 3/26/2002 | 3/27/2002 | 3/27/2002 12:00:00 AM | A | NR |
|
|
###-#### water line need to have well disconnected before calling for meter set 3/27/2002 10:45:05 AM
|
PLM02-00576
| Groundwork | 3/26/2002 | 3/27/2002 | 3/27/2002 12:00:00 AM | A | PASS |
|
|
AS LATE AS POSSIBLE\\###-####
|
PLM02-00366
| Final | 3/26/2002 | 3/27/2002 | 3/27/2002 12:00:00 AM | A | PART |
|
|
###-#### install expansion tank on cold water supply side. turn T/ P line down to floor 3/27/2002 10:42:55 AM
|
PLM02-00756
| Water and/or Sewer | 3/26/2002 | 3/27/2002 | 3/27/2002 12:00:00 AM | A | PASS |
|
|
outside sewer\\###-####
|
PLM02-00771
| Plumbing Rough-in | 3/27/2002 | 3/27/2002 | 3/27/2002 12:00:00 AM | P | PASS |
|
|
###-#### rob
|
PLM02-00210
| Plumbing Rough-in | 3/27/2002 | 3/27/2002 | 3/27/2002 12:00:00 AM | P | PART |
|
|
###-#### ALAN sump tank test ok 3/28/2002 9:15:53 AM
|
PLM02-00091
| Final | 3/27/2002 | 3/27/2002 | 3/27/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 03/27/2002 at 10:59:30. Contact: ###-####.
|