BLD02-00145
| BLD-Energy code compliance | 3/26/2002 | 3/27/2002 | 3/27/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/26/2002 at 11:03:36. Contact: ###-####.. Need plans for determination of interior shear walls. other items ok. 3/27/2002 12:19:57 PM 3/27/2002 12:19:59 PM
|
MEC02-00795
| Rough-in | 3/26/2002 | 3/27/2002 | 3/27/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/26/2002 at 12:18:08. Contact: ###-####. gas test failed c/n. 3/27/2002 12:20:28 PM
|
MEC02-00155
| Final | 3/26/2002 | 3/27/2002 | 3/27/2002 12:00:00 AM | A | DONE |
|
|
###-####. Sticker applied on furnace on 3/26/02. 3/27/2002 11:30:58 AM
|
BLD02-00338
| BLD-Foundation | 3/26/2002 | 3/27/2002 | 3/27/2002 12:00:00 AM | A | PART |
|
|
MARK ###-####
|
BLD02-00397
| BLD-Framing/Rough-in | 3/26/2002 | 3/27/2002 | 3/27/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/26/2002 at 17:51:44. Contact: ###-####. Top of walls will need the support wires , talked with cont, said will be done soon and re-inspection called for. 3/27/2002 11:30:28 AM
|
BLD02-00307
| BLD-Footing | 3/26/2002 | 3/27/2002 | 3/27/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 03/26/2002 at 21:06:11. Contact: ###-####.
|
BLD01-00736
| BLD-Framing/Rough-in | 3/27/2002 | 3/27/2002 | 3/27/2002 12:00:00 AM | P | PART |
|
|
###-####
|
BLD02-00061
| BLD-Final | 3/26/2002 | 3/27/2002 | 3/27/2002 12:00:00 AM | P | FAIL |
|
|
###-#### RON c/n posted. 3/28/2002 3:56:10 PM
|