PLM03-00785
| Plumbing Rough-in | 3/26/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | P | PASS |
|
|
already tested ri ok 3/27/2003 2:28:14 PM
|
PLM03-00782
| Plumbing Rough-in | 3/27/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 3/27/2003 at 6:51:00 AM. Contact: ###-####. everythings ok just needs to insulate the wat 3/27/2003 2:17:56 PM er lines 3/27/2003 2:18:02 PM
|
PLM03-00593
| Water and/or Sewer | 3/27/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | P | PART |
|
|
looked at the vent from the pump chamber, still no word from the arch. about interceptor design
|