BLD00-03449
| BLD-Conference | 3/26/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 3/26/2003 at 1:26:51 PM. Contact: ###-####....work still in progress, HVAC wip, not ready for final, will need spec insp reports, etc. at that time. 3/28/2003 10:20:50 AM
|
BLD02-02521
| BLD-Wall cover | 3/26/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/26/2003 at 4:35:31 PM. Contact: ###-####. c/n made ok insulation ok. 3/27/2003 4:25:27 PM
|
BLD02-00369
| BLD-Framing/Rough-in | 3/27/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | P | FAIL |
|
|
RANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs, c/n...need detail for lateral support of 4hr area walls & attachments for draft stops 3/27/2003 6:37:46 PM
|
BLD03-00284
| BLD-Framing/Rough-in | 3/27/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | P | FAIL |
|
|
RUSS SHEAR NAIL; Phone #: ###-#### Internet Inspection Request from: Darla Downs, c/n...brg for int walls, gas meter inside, elec service clearances, ext nailing ok to side 3/27/2003 6:42:10 PM
|
BLD02-00369
| BLD-Framing/Rough-in | 3/27/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | P | CANC |
|
|
Randy
|