FIR02-00389
| INSP-Final Inspection | 3/26/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | A | PASS |
|
|
JOHN; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD03-00093
| FIRE-Final Inspection | 3/26/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | A | PASS |
|
|
###-#### will have "Door to remain unlocked..." sign and exit sign repaired for structural inspector 3/27/2003 10:13:42 AM
|
BLD02-00463
| FIRE-Final Inspection | 3/26/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | A | PASS |
|
|
###-#### door 102 not latching 3/27/2003 9:34:11 AM
|
BLD02-00462
| FIRE-Final Inspection | 3/26/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | A | PASS |
|
|
###-#### doors 101/102 not latching; no card to sign 3/27/2003 9:34:38 AM
|
FIR03-00050
| INSP-Final Inspection | 3/27/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 3/27/2003 at 8:50:59 AM. Contact: ###-####. okay to cover but will need 200 degree heads in kitchen area as shown on plans 3/27/2003 2:30:54 PM
|
BLD02-02166
| FIRE-Final Inspection | 3/27/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | P | FAIL |
|
|
rod; Phone #: ###-#### Internet Inspection Request from: Annette Moore exit door hardware; address; test duct detectors 3/27/2003 4:02:21 PM
|
FIR02-00493
| INSP-Sprinkler Rough-in/Hydro | 3/27/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 3/27/2003 at 9:48:47 AM. Contact: ###-####. UG and FDC hydro okay 3/27/2003 12:40:46 PM
|
BLD02-01481
| FIRE-Final Inspection | 3/27/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | P | PASS |
|
|
|
BLD02-01261
| FIRE-Final Inspection | 3/27/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | P | PASS |
|
|
|
FIR03-00013
| INSP-Final Inspection | 3/26/2003 | 3/27/2003 | 3/27/2003 12:00:00 AM | P | PASS |
|
|
###-#### received compatability for ESL smoke detector with DMP panel 3/27/2003 2:52:53 PM
|