Inspections for the day of: Monday, March 27, 2006.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-03007 FIRE-Final Inspection3/24/20063/27/20063/27/2006 5:54:53 PMANR
BLD05-02976 FIRE-Final Inspection3/24/20063/27/20063/27/2006 5:54:33 PMANR
FIR05-00594 INSP-Sprinkler Rough-in3/22/20063/27/20063/27/2006 2:38:15 PMPPART
Overhead rough-in is good for cover on floors 10, 9, 8, and 7. Partial inspection of floor 5 as ceiling grid is not complete. Floor 6 and 11 not ready for cover inspection at this time. Also concluded satisfactory 72 hr hydro test of the UG tanks as water level did not drop.
FIR05-00542 INSP-Final Inspection3/24/20063/27/20063/27/2006 11:38:34 AMANR
The underground supply line is not activated at this time.
FIR06-00025 INSP-Final Inspection3/24/20063/27/20063/27/2006 11:36:35 AMAPASS
Fire sprinkler work is satisfactory, permit finaled.