Inspections for the day of: Thursday, March 27, 2008.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-00562 BLD-Footing3/27/20083/27/20083/27/2008 7:14:59 PMPCANC
jsmin Phone #: ###-####
Footings OK.......C/N need to verify blocking and nailing of roof diaphram.....(2) extra posts installed under beams........Need to look at overbuild after ladder provided.
BLD05-03391 BLD-Final3/26/20083/27/20083/27/2008 7:11:52 PMPCANC
Boris = ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
Re-scheduled
BLD07-02891 BLD-Aging Inspection3/27/20083/27/20083/27/2008 3:57:35 PM CANC
Re-scheduled
BLD05-02332 BLD-Conference3/27/20083/27/20083/27/2008 3:36:49 PMPDONE
steve Phone #: ###-####
WIP
BLD07-03128 BLD-Footing3/27/20083/27/20083/27/2008 3:36:12 PMPNR
Scheduled by a contractor via Hello! on 3/27/2008 at 6:21:21 AM. Contact: ###-####.
Need to excavate hole bigger.
BLD06-03277 BLD-Other3/27/20083/27/20083/27/2008 3:33:49 PMPPASS
Scheduled by a contractor via Hello! on 3/27/2008 at 9:09:08 AM.
OK'd 1hr Celing in Mechanical room.....in leiu of walls continuing up to roof deck. Rm at North side of bldg
BLD06-02505 BLD-Framing/Rough-in3/26/20083/27/20083/27/2008 12:40:11 PMAPASS
ron Phone #: ###-####
Frame and energy OK
BLD05-03490 BLD-Final3/26/20083/27/20083/27/2008 12:11:12 PMAPASS
Scheduled by a contractor via Hello! on 3/26/2008 at 2:27:54 PM. Contact: ###-####.
C/C issued
BLD05-03490 DOC - Permit Finaled3/27/20083/27/20083/27/2008 12:10:50 PMPPASS
BLD08-00506 BLD-Footing3/26/20083/27/20083/27/2008 10:49:18 AMAPASS
Wade, early a.m. please = ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
Mono pour footing and slab....OK
BLD07-00306 BLD-Conference3/26/20083/27/20083/27/2008 8:54:59 AMADONE
WIP.....Framing.....