FIR08-00184
| INSP-Sprinkler Rough-in/Hydro | 3/27/2008 | 3/27/2008 | 3/28/2008 8:34:51 AM | P | PASS |
|
|
Sprinkler piping is ok to cover
|
FIR07-00968
| FIR-Aging Inspection | 3/27/2008 | 3/27/2008 | 3/27/2008 4:44:59 PM | | NR |
|
|
work is in progress
|
FIR07-00579
| INSP-Sprinkler Rough-in/Hydro | 3/26/2008 | 3/27/2008 | 3/27/2008 4:43:26 PM | P | PASS |
|
|
OH Hydro Inspection for the gym area passed.
|
FIR08-00171
| INSP-Final Inspection | 3/27/2008 | 3/27/2008 | 3/27/2008 4:04:00 PM | P | PASS |
|
|
Permit finaled
|
FIR07-00949
| INSP-Sprinkler Rough-in | 3/26/2008 | 3/27/2008 | 3/27/2008 4:03:25 PM | A | FAIL |
|
|
The tenting is still inadequate. There are locations where the piping is not covered.
|
FIR07-00510
| INSP-Alarm Testing | 3/26/2008 | 3/27/2008 | 3/27/2008 4:02:05 PM | A | DONE |
|
|
See the city approved plans for items tested today and for the defieciencies noted.
|
BLD07-03252
| FIRE-Final Inspection | 3/26/2008 | 3/27/2008 | 3/27/2008 1:06:59 PM | A | FAIL |
|
|
Provide additional emergency lights as marked on the plans and repair the emergency lights as marked on the plans. Provide a clear fire alarm panel. Install the missing ceiling tile and missing sprinkler canopies.
|
FIR07-00929
| INSP-Sprinkler Rough-in | 3/26/2008 | 3/27/2008 | 3/27/2008 8:57:26 AM | A | PASS |
|
|
Underground flush passed
|