Inspections for the day of: Friday, March 27, 2009.
Number of inspections: 16
Percentage of inspections complete: 94 %
Percentage of inspections not complete: 6 %
Contact Information
InspectorEric Strole
TitlePLM/MEC-INSPECTOR
Phone #794-7913
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS09-00048 PLM-Conference3/26/20093/26/2009 P 
PLM09-00423 Plumbing Rough-in3/27/20093/27/20093/27/2009 4:37:37 PMPPART
Bob Phone #: ###-####-plumbing permit is with wrong building permit & need a core & shell plumbing permit. building drain trunk line pass, water line to mec room pass, need sewer tie-in & water main tie-in.
MEC09-00595 Conference3/27/20093/27/20093/27/2009 4:33:37 PMPDONE
training
MEC08-03006 Conference3/27/20093/27/20093/27/2009 4:33:22 PMPDONE
training
MEC09-00499 Conference3/27/20093/27/20093/27/2009 4:33:05 PMADONE
training
ESC08-00467 Site Final3/27/20093/27/20093/27/2009 3:29:12 PMAPART
see previous inspection notes.
ESC08-00467 DOC - Permit Finaled3/27/20093/27/20093/27/2009 3:21:51 PMPPASS
PLM09-00319 Final3/27/20093/27/20093/27/2009 2:19:15 PMPPASS
JOB # 11438. Phone #: ###-#### Internet Inspection Request from: Ann Marie Reyes
ESC09-00098 BMP Violation3/27/20093/27/20093/27/2009 2:18:51 PMPFAIL
stop work issued on site. left written & verbal correction with rp to maintain concrete washout pit before next pour, clean up concrete on empty lot that concrete truck washed out on instead of using washout pit, remove concrete off to side of washout pit & install perimeter protection on front of lot where over 2 percent grade. rp to call when corrections are complete so stop work can be pulled.
ESC09-00098 INSP - Stop Work Order3/27/20093/27/20093/27/2009 2:18:37 PMPFAIL
stop work issued on site. left written & verbal correction with rp to maintain concrete washout pit before next pour, clean up concrete on empty lot that concrete truck washed out on instead of using washout pit, remove concrete off to side of washout pit & install perimeter protection on front of lot where over 2 percent grade. rp to call when corrections are complete so stop work can be pulled.
ESC06-01691 Site Final3/27/20093/27/20093/27/2009 11:40:07 AMAPASS
ESC06-01691 Site Final3/27/20093/27/20093/27/2009 11:39:57 AMPPASS
MEC09-00499 Conference3/27/20093/27/20093/27/2009 9:53:45 AMACANC
training
PLM09-00388 Sprinkler (Final)3/26/20093/27/20093/27/2009 9:52:01 AMAPASS
thad Phone #: ###-####
ESC06-01268 Aging Inspection3/27/20093/27/20093/27/2009 9:20:30 AM PASS
ESC06-01268 Site Final3/27/20093/27/20093/27/2009 9:20:14 AMPPASS