Inspections for the day of: Friday, March 27, 2009.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC03-00596 Site Final3/27/20093/27/20093/27/2009 3:47:54 PMPPASS
ESC03-00543 Site Final3/27/20093/27/20093/27/2009 3:47:45 PMPPASS
ESC08-00982 Random Inspection3/27/20093/27/20093/27/2009 3:46:03 PMPPASS
ESC09-00052 BMP Violation3/26/20093/27/20093/27/2009 3:40:52 PMPPART
In the process of cleaning up the project. All signs have been placed.
ESC07-01393 Random Inspection3/27/20093/27/20093/27/2009 2:42:34 PMAPASS
No activity.
ESC07-01557 Random Inspection3/27/20093/27/20093/27/2009 2:42:23 PMAPASS
No activity.
ESC09-00098 INSP - Stop Work Order3/27/20093/27/20093/27/2009 2:41:33 PMPFAIL
Photo documentated of all violations pertaining to the "Stop Work Order" that was placed by inspector #380.
ESC08-00718 BMP Violation3/26/20093/27/20093/27/2009 1:18:25 PMPPASS
Issue has been corrected.
ESC08-00952 Random Inspection3/27/20093/27/20093/27/2009 10:35:41 AMAPASS
ESC09-00132 Site Preparation3/27/20093/27/20093/27/2009 10:04:58 AM PART
Verbal message to RP:
1. Post ESC sign at front of access to the home.
ESC09-00075 Random Inspection3/27/20093/27/20093/27/2009 10:04:03 AMAFAIL
Verbal to RP:
1. clean up all hard surfaces of all sediment and debris.
2. Provide a trash conainer for all trash debris and place inside of the container.
3. Maintain storm drain inlet protection.
Will re-inspect on 3/30/09 AM.
ESC05-01851 Site Final3/27/20093/27/20093/27/2009 9:56:02 AMPPASS
ESC09-00125 Site Preparation3/27/20093/27/20093/27/2009 9:55:08 AM FAIL
Vebal message to RP's office(HardRock): Clean up all sediment and debris off of all hard surfaces by the end of the day. Will re-inspect on 3/30/09AM.
ESC08-00779 Random Inspection3/27/20093/27/20093/27/2009 9:28:39 AMAPART
Verbal to RP:
1. Prior to next pour date, re-establish the concrete washout pit.
2. Clean all sediment from the valley gutter by the end of the end of the day.
Will re-inspect on 3/31/09AM.
ESC09-00126 Site Preparation3/27/20093/27/20093/27/2009 8:51:53 AM PASS
ESC09-00122 Site Preparation3/20/20093/27/20093/26/2009 6:31:51 AMACANC
Moved to 3/26/09.