FIR12-00109
| INSP-Sprinkler Rough-in | 3/27/2012 | 3/27/2012 | 3/28/2012 2:34:36 PM | P | PASS |
|
|
Supply line piping is ok to cover.
|
BLD12-00222
| FIRE-Final Inspection | 3/27/2012 | 3/27/2012 | 3/27/2012 1:54:05 PM | P | PASS |
|
|
Life safety passed. I noted to the contractor that the gate could not be locked with the padlock and I went over the specific storage issues such as height and commodity as listed with the Treasure Valley Fire Protection letter that was part of the approved plans package.
|