Inspections for the day of: Wednesday, March 27, 2013.
Number of inspections: 7
Percentage of inspections complete: 86 %
Percentage of inspections not complete: 14 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00130 INSP-Final Inspection3/26/20133/27/20133/27/2013 3:46:58 PMPPASS
Permit finaled
FIR12-00648 FIR-Aging Inspection3/27/20133/27/20133/27/2013 2:44:10 PM NR
work is in progress
FIR13-00095 INSP-Sprinkler Rough-in/Hydro3/25/20133/27/20133/27/2013 2:43:06 PMAPASS
Todays inspection was an approval to cover the underground supply piping and an approval for the underground supply piping hydro test. I let Don know that as-builts showing the two additional 4" elbows will be required at the end of the project.
BLD12-03314 FIRE-Final Inspection3/27/20133/27/20133/27/2013 2:29:58 PMPFAIL
Three emergency lights failed to function all other items have been corrected.
BLD13-00056 FIRE-Final Inspection3/26/20133/27/20133/27/2013 2:28:58 PMPFAIL
Two demo/showcase "sun rooms" have been built in the showroom area that are not on the city approved plans. The exit doors are sliders with small flip/lever locks and 2" high thresholds that do not appear to meet code. I spoke to Tim in plan review and he has requested the owner to come down town to update the drawings and to discuss exiting requirements.
FIR11-00503 INSP-Final Inspection3/26/20133/27/20133/27/2013 2:23:33 PMAPASS
Permit finaled
MIS13-00072 FIR-Conference3/27/20133/27/2013 P 
waiting on Stephanie to check documents