FIR13-00130
| INSP-Final Inspection | 3/26/2013 | 3/27/2013 | 3/27/2013 3:46:58 PM | P | PASS |
|
|
Permit finaled
|
FIR12-00648
| FIR-Aging Inspection | 3/27/2013 | 3/27/2013 | 3/27/2013 2:44:10 PM | | NR |
|
|
work is in progress
|
FIR13-00095
| INSP-Sprinkler Rough-in/Hydro | 3/25/2013 | 3/27/2013 | 3/27/2013 2:43:06 PM | A | PASS |
|
|
Todays inspection was an approval to cover the underground supply piping and an approval for the underground supply piping hydro test. I let Don know that as-builts showing the two additional 4" elbows will be required at the end of the project.
|
BLD12-03314
| FIRE-Final Inspection | 3/27/2013 | 3/27/2013 | 3/27/2013 2:29:58 PM | P | FAIL |
|
|
Three emergency lights failed to function all other items have been corrected.
|
BLD13-00056
| FIRE-Final Inspection | 3/26/2013 | 3/27/2013 | 3/27/2013 2:28:58 PM | P | FAIL |
|
|
Two demo/showcase "sun rooms" have been built in the showroom area that are not on the city approved plans. The exit doors are sliders with small flip/lever locks and 2" high thresholds that do not appear to meet code. I spoke to Tim in plan review and he has requested the owner to come down town to update the drawings and to discuss exiting requirements.
|
FIR11-00503
| INSP-Final Inspection | 3/26/2013 | 3/27/2013 | 3/27/2013 2:23:33 PM | A | PASS |
|
|
Permit finaled
|
MIS13-00072
| FIR-Conference | 3/27/2013 | 3/27/2013 | | P | |
|
|
waiting on Stephanie to check documents
|